|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2019 Measured TD: 10735 ft. Vertical TD: 10592 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/12/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 7S 93W | Footage: 680 FSL 2558 FWL | | Bottom Hole Location: | Sec:16 Twp: 7S 93W | Footage: 680 FSL 2558 FWL | | Proposed Depth/Form: | 10917 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Middleton Creek | Unit Number: | COC068997X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: .25 , Citings Type: PLANNED | | Cement: | Sacks: 5, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1635 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 497, Top: 0 ft., Bottom: 1653 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 10917 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 741, Top: 0 ft., Bottom: 10917 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/15/2012 | | Spud Date: | 10/28/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 10735 ft. | Measured PB depth: | 10667 ft. | | True Vertical TD: | 10592 ft. | True Vertical PB depth: | 10524 ft. | | Top PZ Location: | Sec:16 Twp: 7S 93W | Footage: 667 FSL 2533 FEL | | Bottom Hole Location: | Sec:16 Twp: 7S 93W | Footage: 682 FSL 2523 FEL | | Log Types: | RST, CBL (incluced on Neutron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 72 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 72 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1701 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 464, Top: 0 ft., Bottom: 1725 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10615 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 943, Top: 4770 ft., Bottom: 10735 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 6184 ft. | 6750 ft. | N | N | | WILLIAMS FORK | 6751 ft. | 9768 ft. | N | N | | ROLLINS | 9769 ft. | 10201 ft. | N | N | | COZZETTE | 10202 ft. | 10414 ft. | N | N | | CORCORAN | 10415 ft. | 10735 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: PR - 4/1/2019 Interval Top: 10422 ft. Interval Bottom: 10515 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 7/22/2012 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/15/2012 | Treatment End Date: | 7/22/2012 | | Treatment Summary: | Stage 1 treated with a total of: 9,524 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 9524 | Max pressure during treatment (psi): | 6544 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 9524 | Total flowback volume recovered (bbls): | 1133 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/10/2012 | Treatment End Date: | 7/15/2012 | | Treatment Summary: | Stage 1 treated with a total of: 9,524 bbls of Slickwater | | Total fluid used in treatment (bbls): | 9524 | Max pressure during treatment (psi): | 6544 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 9524 | Total flowback volume recovered (bbls): | 30981 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10209 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/20/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 670 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 670 | | CALC_MCF_GAS | 1413 | | CASING_PRESS | 2300 | | MCF_GAS | 1413 | | TUBING_PRESS | 1250 |
| | Perforation Data: | | Interval Top: | 10422 ft. | # Of Holes: | 27 | | Interval Bottom: | 10515 ft. | Hole Size: | 0.38 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 4/1/2019 Interval Top: 10210 ft. Interval Bottom: 10367 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 7/22/2012 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/10/2012 | Treatment End Date: | 7/15/2012 | | Treatment Summary: | Stage 2 treated with a total of: 9,524 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 9524 | Max pressure during treatment (psi): | 6544 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 9524 | Total flowback volume recovered (bbls): | 1133 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10209 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/20/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 670 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 670 | | CALC_MCF_GAS | 1413 | | CASING_PRESS | 2300 | | MCF_GAS | 1413 | | TUBING_PRESS | 1250 |
| | Perforation Data: | | Interval Top: | 10210 ft. | # Of Holes: | 27 | | Interval Bottom: | 10367 ft. | Hole Size: | 0.38 in. |
|
Formation WMFK Formation Classification: GW Status: PR - 4/1/2019 Interval Top: 7818 ft. Interval Bottom: 9677 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/10/2012 | Treatment End Date: | 7/15/2012 | | Treatment Summary: | Stages 3-9 treated with a total of: 57,368 bbls of Slickwater | | Total fluid used in treatment (bbls): | 57368 | Max pressure during treatment (psi): | 6544 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 57368 | Total flowback volume recovered (bbls): | 1133 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10209 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/20/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 670 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 670 | | CALC_MCF_GAS | 1413 | | CASING_PRESS | 2300 | | MCF_GAS | 1413 | | TUBING_PRESS | 1250 |
| | Perforation Data: | | Interval Top: | 7818 ft. | # Of Holes: | 189 | | Interval Bottom: | 9677 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 116 |
| Total Gas Produced (MCF) | 23495 |
| GOR | 202543 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.424 |
| Average MCFE per Day | 66.246 |
| Federal Financial Assurance | i | Y |
|
|