|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/20/2016 Measured TD: 10070 ft. Vertical TD: 9941 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/20/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/2/2017 | | Proposed Top PZ Location: | Sec:21 Twp: 6S 96W | Footage: 1092 FNL 1996 FEL | | Bottom Hole Location: | Sec:21 Twp: 6S 96W | Footage: 1092 FNL 1996 FEL | | Proposed Depth/Form: | 9960 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-53 , Unit Acreage: 11510, Drill Unit: L6,L7,E2NW,NE,N2SE | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9960 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 9960 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/9/2015 | | Spud Date: | 5/26/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 10070 ft. | Measured PB depth: | 10009 ft. | | True Vertical TD: | 9941 ft. | True Vertical PB depth: | 9880 ft. | | Top PZ Location: | Sec:21 Twp: 6S 96W | Footage: 1033 FNL 1952 FEL | | Bottom Hole Location: | Sec:21 Twp: 6S 96W | Footage: 1098 FNL 2002 FEL | | Log Types: | Cased-Hole & CBL run. No Open-Hole Log run on this pad. Use Open-Hole Log run on School House Point OM01A A21 696 | API 05-045-14955-00. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 123 ft., Weight: 52.8 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2863 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1284, Top: 200 ft., Bottom: 2863 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10046 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 909, Top: 5140 ft., Bottom: 10046 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 200 ft., Bottom: 200 ft., Sacks: 1224, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OHIO CREEK | 6711 ft. | 7003 ft. | | | | WILLIAMS FORK | 7003 ft. | 9606 ft. | | | | CAMEO | 9606 ft. | 9822 ft. | | | | ROLLINS | 9822 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 1/20/2016 Interval Top: 7730 ft. Interval Bottom: 9677 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/10/2015 | Treatment End Date: | 8/17/2015 | | Treatment Summary: | HCL 7.5% (BBLS): 83.33
RECYCLED PRODUCED WATER (BBLS): 117,564
SCALE CHECK PILL (BBLS): 525
ClO2 (BBLS): 5.52
| | Total fluid used in treatment (bbls): | 118178 | Max pressure during treatment (psi): | 7108 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 83 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | 118089 | Total flowback volume recovered (bbls): | 53284 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9211 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2409 | | BTU_GAS | 11 | | CALC_BBLS_H2O | 2409 | | CALC_MCF_GAS | 4537 | | CASING_PRESS | 848 | | GRAVITY_OIL | 52 | | MCF_GAS | 4537 | | TUBING_PRESS | 612 |
| | Perforation Data: | | Interval Top: | 7730 ft. | # Of Holes: | 282 | | Interval Bottom: | 9677 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 118 |
| Total Gas Produced (MCF) | 50665 |
| GOR | 429364 |
| GOR Determination | MCFE |
| Average BOE per Day | 24.273 |
| Average MCFE per Day | 140.787 |
| Federal Financial Assurance | i | |
|
|