Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20304
Well Classification: GW Status: PR - 1/20/2016
Well Name/No:School House Point #OM08C B21 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/20/2016
FacilityID:421132LocationID:421108
County:GARFIELD #045Location:NENE 21 6S96W 6
Field:GRAND VALLEY - #31290Elevation:8288 ft.
Basin:PICEANCE BASIN  
Planned Location:471FNL  890 FELLat/Long: 39.514464 / -108.107831Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.514460 / -108.107823Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/20/2016             Measured TD: 10142 ft.    Vertical TD: 9951 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/20/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/2/2017
Proposed Top PZ Location:Sec:21 Twp: 6S 96W Footage: 2074 FNL  721 FEL
Bottom Hole Location:Sec:21 Twp: 6S 96W Footage: 2074 FNL  721 FEL
Proposed Depth/Form:10039 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-53 , Unit Acreage: 11510, Drill Unit: L6,L7,E2NW,NE,N2SE
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10039 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 600, Top: , Bottom: 10039 ft.

Wellbore Completed
Completion Date:6/29/2015
Spud Date:6/21/2015Spud Date Is:ACTUAL
Measured TD:10142 ft.Measured PB depth:10067 ft.
True Vertical TD:9951 ft.True Vertical PB depth:9876 ft.
Top PZ Location:Sec:21 Twp: 6S 96WFootage: 2066 FNL  696 FEL
Bottom Hole Location:Sec:21 Twp: 6S 96WFootage: 2066 FNL  696 FEL
Log Types:CBL & Cased Hole (Gamma)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 123 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2832 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1023, Top: 200 ft., Bottom: 2832 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10112 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 909, Top: 4684 ft., Bottom: 10112 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 0 ft., Bottom: 200 ft., Sacks: 1170, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK6799 ft.7046 ft.
WILLIAMS FORK7046 ft.9660 ft.
CAMEO9660 ft.9898 ft.
ROLLINS9898 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/20/2016                 Interval Top: 7808 ft.    Interval Bottom: 9400 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/25/2015Treatment End Date:9/2/2015
Treatment Summary:HCL 7.5% (BBLS): 83 RECYCLED PRODUCED WATER (BBLS): 119,966 SCALE CHECK PILL (BBLS): 525 ClO2 (BBLS): 0
Total fluid used in treatment (bbls):120574Max pressure during treatment (psi):6780
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.44
Recycled water used in treatment (bbls):120491Total flowback volume recovered (bbls):41848
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8333 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1115
BTU_GAS 1100
CALC_BBLS_H2O 1115
CALC_MCF_GAS 4849
CASING_PRESS 930
MCF_GAS 4849
TUBING_PRESS 768
Perforation Data:
Interval Top:7808 ft.# Of Holes:302
Interval Bottom:9400 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)269
Total Gas Produced (MCF)98901
GOR367661
GOR DeterminationMCFE
Average BOE per Day47.473
Average MCFE per Day275.326

 Federal Financial Assurance  i 

 Tribal Well  i No