Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20297
Well Classification: GW Status: PR - 6/16/2012
Well Name/No:N. Parachute #EF01F-34 P27595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/16/2012
FacilityID:421125LocationID:335806
County:GARFIELD #045Location:SESE 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6650 ft.
Basin:PICEANCE BASIN  
Planned Location:608FSL  539 FELLat/Long: 39.579244 / -108.033133Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.579245 / -108.033135Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/6/2012
End Date: 6/6/2012
Reported: 9/18/2012
Days to report: 104
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/16/2012             Measured TD: 10380 ft.    Vertical TD: 10117 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/16/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/8/2013
Proposed Top PZ Location:Sec:34 Twp: 5S 95W Footage: 1108 FNL  650 FEL
Bottom Hole Location:Sec:34 Twp: 5S 95W Footage: 1108 FNL  650 FEL
Proposed Depth/Form:11333 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-49 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: , Depth: 120 ft., Weight: Linepipe , Citings Type: PLANNED
Cement:Sacks: 117, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1800 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 383, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11333 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 592, Top: , Bottom: 11333 ft.

Wellbore Completed
Completion Date:2/5/2012
Spud Date:11/19/2011Spud Date Is:ACTUAL
Measured TD:10380 ft.Measured PB depth:10333 ft.
True Vertical TD:10117 ft.True Vertical PB depth:10007 ft.
Top PZ Location:Sec:34 Twp: 5S 95WFootage: 1098 FNL  637 FEL
Bottom Hole Location:Sec:34 Twp: 5S 95WFootage: 1100 FNL  657 FEL
Log Types:CBL and Mud.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1829 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 1850 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10359 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1385, Top: 3000 ft., Bottom: 10380 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6671 ft.10229 ft.NN
ROLLINS10230 ft.10380 ft.NN

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 6/16/2012                 Interval Top: 6677 ft.    Interval Bottom: 10165 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/9/2012Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/7/2012
Treatment Summary:Stages 1-13 treated with a total of: 484,783 bbls of Slickwater.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/16/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 421
BTU_GAS 1170
CALC_BBLS_H2O 421
CALC_MCF_GAS 1609
CASING_PRESS 1197
MCF_GAS 1609
Perforation Data:
Interval Top:6677 ft.# Of Holes:750
Interval Bottom:10165 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)281
Total Gas Produced (MCF)54467
GOR193832
GOR DeterminationMCFE
Average BOE per Day26.160
Average MCFE per Day151.724

 Federal Financial Assurance  i 

 Tribal Well  i No