Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20296
Well Classification: GW Status: PR - 12/1/2012
Well Name/No:N. Parachute #EF16E-27 P27595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2012
FacilityID:421124LocationID:335806
County:GARFIELD #045Location:SESE 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6649 ft.
Basin:PICEANCE BASIN  
Planned Location:652FSL  559 FELLat/Long: 39.579364 / -108.033206Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.579365 / -108.033206Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/19/2012
End Date: 11/19/2012
Reported: 1/10/2013
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2012             Measured TD: 11060 ft.    Vertical TD: 11050 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/8/2013
Proposed Top PZ Location:Sec:27 Twp: 5S 95W Footage: 384 FSL  677 FEL
Bottom Hole Location:Sec:27 Twp: 5S 95W Footage: 384 FSL  677 FEL
Proposed Depth/Form:11139 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-49 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: , Depth: 120 ft., Weight: Line pipe, Citings Type: PLANNED
Cement:Sacks: 117, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1800 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 383, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11139 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 592, Top: , Bottom: 11139 ft.

Wellbore Completed
Completion Date:4/5/2012
Spud Date:2/13/2012Spud Date Is:ACTUAL
Measured TD:11060 ft.Measured PB depth:11006 ft.
True Vertical TD:11050 ft.True Vertical PB depth:10996 ft.
Top PZ Location:Sec:27 Twp: 5S 95WFootage: 387 FSL  660 FEL
Bottom Hole Location:Sec:27 Twp: 5S 95WFootage: 371 FSL  665 FEL
Log Types:RST, CBL (included in Triple Combo) Mud and Hole Volume.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 118 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 284, Top: 0 ft., Bottom: 118 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1819 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 431, Top: 22 ft., Bottom: 1819 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11029 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1463, Top: 2415 ft., Bottom: 11060 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6531 ft.10043 ft.NN
ROLLINS10044 ft.10322 ft.NN
COZZETTE10323 ft.10496 ft.NN
SEGO10497 ft.11060 ft.NN

Formation SEGO                     Formation Classification:  OW                     Status:  PR - 12/1/2012                 Interval Top: 10506 ft.    Interval Bottom: 10867 ft.

 Completed Information for Formation SEGO
1st Production Date:11/23/2012Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/5/2012Treatment End Date:11/19/2012
Treatment Summary:Stage 1 treated with a total of: 12,850 bbls of Slickwater
Total fluid used in treatment (bbls):12850Max pressure during treatment (psi):6371
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.50
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):12850Total flowback volume recovered (bbls):21253
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3775
BTU_GAS 1170
CALC_BBLS_H2O 3775
CALC_MCF_GAS 3633
CASING_PRESS 1915
MCF_GAS 3633
Perforation Data:
Interval Top:10506 ft.# Of Holes:30
Interval Bottom:10867 ft.Hole Size:0.42 in.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 12/1/2012                 Interval Top: 6535 ft.    Interval Bottom: 9894 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:11/23/2012Choke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/5/2012Treatment End Date:11/19/2012
Treatment Summary:Stages 2-9 treated with a total of: 102,490 bbls of Slickwater.
Total fluid used in treatment (bbls):102490Max pressure during treatment (psi):6371
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.50
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):102490Total flowback volume recovered (bbls):21253
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3775
BTU_GAS 1170
CALC_BBLS_H2O 3775
CALC_MCF_GAS 3663
CASING_PRESS 1915
MCF_GAS 3663
Perforation Data:
Interval Top:6535 ft.# Of Holes:240
Interval Bottom:9894 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)89
Total Gas Produced (MCF)15826
GOR177820
GOR DeterminationMCFE
Average BOE per Day7.599
Average MCFE per Day44.073

 Federal Financial Assurance  i 

 Tribal Well  i No