Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20292
Well Classification: GW Status: PR - 1/8/2013
Well Name/No:N. Parachute #EF09F-27 P27 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/8/2013
FacilityID:421120LocationID:335806
County:GARFIELD #045Location:SESE 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6650 ft.
Basin:PICEANCE BASIN  
Planned Location:710FSL  585 FELLat/Long: 39.579525 / -108.033300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.579524 / -108.033301Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2012
End Date: 12/13/2012
Reported: 1/10/2013
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/8/2013             Measured TD: 10275 ft.    Vertical TD: 10225 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/8/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/8/2013
Proposed Top PZ Location:Sec:27 Twp: 5S 95W Footage: 1468 FSL  649 FEL
Bottom Hole Location:Sec:27 Twp: 5S 95W Footage: 1468 FSL  649 FEL
Proposed Depth/Form:11229 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-49 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: , Depth: 120 ft., Weight: Line pipe, Citings Type: PLANNED
Cement:Sacks: 117, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1800 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 383, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11229 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 592, Top: , Bottom: 11229 ft.

Wellbore Completed
Completion Date:7/1/2012
Spud Date:4/24/2012Spud Date Is:ACTUAL
Measured TD:10275 ft.Measured PB depth:10222 ft.
True Vertical TD:10225 ft.True Vertical PB depth:10172 ft.
Top PZ Location:Sec:27 Twp: 5S 95WFootage: 1473 FSL  638 FEL
Bottom Hole Location:Sec:27 Twp: 5S 95WFootage: 1456 FSL  672 FEL
Log Types:CBL and Mud.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 118 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 293, Top: 0 ft., Bottom: 118 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 1830 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10247 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1585, Top: 2265 ft., Bottom: 10275 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6575 ft.10131 ft.NN
ROLLINS10132 ft.10275 ft.NN

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 1/8/2013                  Interval Top: 6593 ft.    Interval Bottom: 10085 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/1/2013Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/29/2012Treatment End Date:12/13/2012
Treatment Summary:Stages 1-8 treated with a total of: 201,620 bbl Sllickwater.
Total fluid used in treatment (bbls):201620Max pressure during treatment (psi):6255
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):201620Total flowback volume recovered (bbls):27630
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/8/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4115
BTU_GAS 1170
CALC_BBLS_H2O 4115
CALC_MCF_GAS 1945
CASING_PRESS 1614
MCF_GAS 1945
Perforation Data:
Interval Top:6593 ft.# Of Holes:240
Interval Bottom:10085 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)108
Total Gas Produced (MCF)19898
GOR184240
GOR DeterminationMCFE
Average BOE per Day9.631
Average MCFE per Day55.899

 Federal Financial Assurance  i 

 Tribal Well  i No