|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/5/2012 Measured TD: 8919 ft. Vertical TD: 8618 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/5/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/11/2012 | | Proposed Top PZ Location: | Sec:20 Twp: 6S 95W | Footage: 2340 FSL 614 FEL | | Bottom Hole Location: | Sec:20 Twp: 6S 95W | Footage: 2340 FSL 614 FEL | | Proposed Depth/Form: | 9038 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: s/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 904 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 316, Top: 0 ft., Bottom: 904 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9038 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 628, Top: 5181 ft., Bottom: 9038 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/11/2011 | | Spud Date: | 8/3/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8919 ft. | Measured PB depth: | 8876 ft. | | True Vertical TD: | 8618 ft. | True Vertical PB depth: | 8575 ft. | | Top PZ Location: | Sec:20 Twp: 6S 95W | Footage: 2348 FSL 1163 FEL | | Bottom Hole Location: | Sec:20 Twp: 6S 95W | Footage: 2363 FSL 1173 FEL | | Log Types: | CBL/RPM & Mud Logs | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 33, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 917 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 917 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8907 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 990, Top: 3460 ft., Bottom: 8907 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 3016 ft. | | | | | MESAVERDE | 5387 ft. | | | | | CAMEO | 8076 ft. | | | | | ROLLINS | 8797 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 4/5/2012 Interval Top: 6529 ft. Interval Bottom: 8714 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/3/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/28/2011 | | Treatment Summary: | 4538 Gals 7 1/2% HCL; 1069500# 40/70 Sand; 49171 Bbls Slickwater (Summary) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8504 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1054 | | CALC_MCF_GAS | 1140 | | CASING_PRESS | 2183 | | MCF_GAS | 1140 | | TUBING_PRESS | 1698 |
| | Perforation Data: | | Interval Top: | 6529 ft. | # Of Holes: | 153 | | Interval Bottom: | 8714 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: Status: CM - 8/1/2012 Interval Top: 6529 ft. Interval Bottom: 8714 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 4/5/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/28/2011 | | Treatment Summary: | 4538 GALS 7 1/2% HCL; 1069500# 40/70 SAND; 49171 BBLS SLICKWATER;(SUMMARY) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8504 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2012 | Test Method: | 0 | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1054 | | CALC_MCF_GAS | 1140 | | CASING_PRESS | 2183 | | MCF_GAS | 1140 | | TUBING_PRESS | 1698 |
| | Perforation Data: | | Interval Top: | 6529 ft. | # Of Holes: | 153 | | Interval Bottom: | 8714 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 44 |
| Total Gas Produced (MCF) | 18735 |
| GOR | 425795 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.969 |
| Average MCFE per Day | 52.001 |
| Federal Financial Assurance | i | Y |
|
|