|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/8/2012 Measured TD: 8190 ft. Vertical TD: 8004 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/8/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/11/2012 | | Proposed Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 2474 FNL 1982 FWL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 2474 FNL 1982 FWL | | Proposed Depth/Form: | 8274 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-62 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 5, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1400 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8274 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 655, Top: 0 ft., Bottom: 8274 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/27/2011 | | Spud Date: | 10/15/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8190 ft. | Measured PB depth: | 8056 ft. | | True Vertical TD: | 8004 ft. | True Vertical PB depth: | 7870 ft. | | Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 2860 FNL 1974 FWL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 2851 FNL 1989 FWL | | Log Types: | RST, IBC and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1256 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 409, Top: 0 ft., Bottom: 1280 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8112 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 638, Top: 2530 ft., Bottom: 8190 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 5136 ft. | 5842 ft. | N | N | | WILLIAMS FORK | 5843 ft. | 8013 ft. | N | N | | ROLLINS | 8014 ft. | 8190 ft. | N | N |
Formation WMFK Formation Classification: OW Status: PR - 5/8/2012 Interval Top: 6228 ft. Interval Bottom: 7979 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 5/1/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/4/2012 | | Treatment Summary: | Stages 1-7 treated with a total of: 70,343 bbls of Slicwater. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7309 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/8/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 564 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 564 | | CALC_MCF_GAS | 1382 | | CASING_PRESS | 1500 | | MCF_GAS | 1382 | | TUBING_PRESS | 875 |
| | Perforation Data: | | Interval Top: | 6228 ft. | # Of Holes: | 189 | | Interval Bottom: | 7979 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 53 |
| Total Gas Produced (MCF) | 47910 |
| GOR | 903962 |
| GOR Determination | MCFE |
| Average BOE per Day | 22.792 |
| Average MCFE per Day | 132.203 |
| Federal Financial Assurance | i | Y |
|
|