Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20085
Well Classification: GW Status: PR - 5/14/2013
Well Name/No:Savage #PA 313-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/14/2013
FacilityID:419994LocationID:334813
County:GARFIELD #045Location:NESW 4 7S95W 6
Field:PARACHUTE - #67350Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1520FSL  1427 FWLLat/Long: 39.463518 / -108.006940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.463519 / -108.006938Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/8/2013
End Date: 3/8/2013
Reported: 4/18/2013
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/14/2013             Measured TD: 7090 ft.    Vertical TD: 6936 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/14/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:4 Twp: 7S 95W Footage: 2227 FSL  571 FWL
Bottom Hole Location:Sec:4 Twp: 7S 95W Footage: 2227 FSL  571 FWL
Proposed Depth/Form:7073 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 738 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 261, Top: 0 ft., Bottom: 738 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7073 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 565, Top: 3601 ft., Bottom: 7073 ft.

Wellbore Completed
Completion Date:1/25/2013
Spud Date:1/18/2013Spud Date Is:ACTUAL
Measured TD:7090 ft.Measured PB depth:7042 ft.
True Vertical TD:6936 ft.True Vertical PB depth:6888 ft.
Top PZ Location:Sec:4 Twp: 7S 95WFootage: 2235 FSL  555 FWL
Bottom Hole Location:Sec:4 Twp: 7S 95WFootage: 2231 FSL  555 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 41 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 41 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.625 in., Size: 9.625 in., Top: 0 ft., Depth: 728 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 728 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7076 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 2770 ft., Bottom: 7076 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1978 ft.
MESAVERDE3811 ft.
CAMEO6060 ft.
ROLLINS6933 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/30/2013                 Interval Top: 5337 ft.    Interval Bottom: 6834 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/9/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/2/2013Treatment End Date:3/8/2013
Treatment Summary:610500 #40/70 Sand; 17230 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):17230Max pressure during treatment (psi):4907
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):17230Total flowback volume recovered (bbls):6717
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):610500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6695 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1044
CALC_MCF_GAS 481
CASING_PRESS 792
MCF_GAS 481
TUBING_PRESS 544
Perforation Data:
Interval Top:5337 ft.# Of Holes:108
Interval Bottom:6834 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)12110
GOR807333
GOR DeterminationMCFE
Average BOE per Day5.766
Average MCFE per Day33.453

 Federal Financial Assurance  i 

 Tribal Well  i No