|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/15/2013 Measured TD: 7010 ft. Vertical TD: 6923 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/15/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/2/2014 | | Proposed Top PZ Location: | Sec:4 Twp: 7S 95W | Footage: 1891 FSL 708 FWL | | Bottom Hole Location: | Sec:4 Twp: 7S 95W | Footage: 1891 FSL 708 FWL | | Proposed Depth/Form: | 7002 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 859 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 859 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7001 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 568, Top: 3531 ft., Bottom: 7001 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/3/2013 | | Spud Date: | 1/2/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7010 ft. | Measured PB depth: | 6962 ft. | | True Vertical TD: | 6923 ft. | True Vertical PB depth: | 6875 ft. | | Top PZ Location: | Sec:4 Twp: 7S 95W | Footage: 1889 FSL 694 FWL | | Bottom Hole Location: | Sec:4 Twp: 7S 95W | Footage: 1907 FSL 700 FWL | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM)
| | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 41 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 16, Top: 0 ft., Bottom: 41 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 887 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 887 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6995 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1080, Top: 2620 ft., Bottom: 6995 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1657 ft. | | | | | MESAVERDE | 3750 ft. | | | | | CAMEO | 5917 ft. | | | | | ROLLINS | 6873 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 3/31/2013 Interval Top: 5102 ft. Interval Bottom: 6766 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 2/21/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/19/2013 | Treatment End Date: | 3/8/2013 | | Treatment Summary: | 689397#40/70 Sand; 20516 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes. | | Total fluid used in treatment (bbls): | 20516 | Max pressure during treatment (psi): | 5513 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.69 | | Recycled water used in treatment (bbls): | 20516 | Total flowback volume recovered (bbls): | 15022 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 689397 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6600 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/31/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1016 | | CALC_MCF_GAS | 1099 | | CASING_PRESS | 1227 | | MCF_GAS | 1099 | | TUBING_PRESS | 1033 |
| | Perforation Data: | | Interval Top: | 5102 ft. | # Of Holes: | 120 | | Interval Bottom: | 6766 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 26 |
| Total Gas Produced (MCF) | 21608 |
| GOR | 831076 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.280 |
| Average MCFE per Day | 59.636 |
| Federal Financial Assurance | i | |
|
|