Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20061
Well Classification: GW Status: PR - 4/30/2013
Well Name/No:Savage #PA 444-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2013
FacilityID:419925LocationID:334813
County:GARFIELD #045Location:NESW 4 7S95W 6
Field:PARACHUTE - #67350Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1482FSL  1450 FWLLat/Long: 39.463413 / -108.006857Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.463413 / -108.006853Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/30/2013
End Date: 1/30/2013
Reported: 3/28/2013
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/30/2013             Measured TD: 7615 ft.    Vertical TD: 6953 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/30/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:5 Twp: 7S 95W Footage: 629 FSL  720 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 629 FSL  720 FEL
Proposed Depth/Form:7582 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-36 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1236 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 431, Top: 0 ft., Bottom: 1236 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7581 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 561, Top: 4132 ft., Bottom: 7581 ft.

Wellbore Completed
Completion Date:12/3/2012
Spud Date:11/26/2012Spud Date Is:ACTUAL
Measured TD:7615 ft.Measured PB depth:7560 ft.
True Vertical TD:6953 ft.True Vertical PB depth:6898 ft.
Top PZ Location:Sec:5 Twp: 7s 95wFootage: 648 FSL  712 FEL
Bottom Hole Location:Sec:5 Twp: 7s 95wFootage: 655 FSL  710 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 68 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 45, Top: 0 ft., Bottom: 68 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1249 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 1249 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7602 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1065, Top: 3880 ft., Bottom: 7602 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1642 ft.
MESAVERDE3682 ft.
CAMEO5992 ft.
ROLLINS6762 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/30/2013                 Interval Top: 5647 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/31/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/24/2013Treatment End Date:1/30/2013
Treatment Summary:793000#40/70 Sand; 22147 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):22147Max pressure during treatment (psi):3041
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):22147Total flowback volume recovered (bbls):6892
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):793000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7200 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2013Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1032
CALC_MCF_GAS 421
CASING_PRESS 848
MCF_GAS 421
TUBING_PRESS 471
Perforation Data:
Interval Top:5647 ft.# Of Holes:133
Interval Bottom:7382 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)17387
GOR724458
GOR DeterminationMCFE
Average BOE per Day8.285
Average MCFE per Day48.045

 Federal Financial Assurance  i 

 Tribal Well  i No