|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2024 Measured TD: 10090 ft. Vertical TD: 9946 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/25/2012 | | Proposed Top PZ Location: | Sec:34 Twp: 7S 95W | Footage: 2231 FSL 688 FEL | | Bottom Hole Location: | Sec:34 Twp: 7S 95W | Footage: 2231 FSL 688 FEL | | Proposed Depth/Form: | 10882 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 640, Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 200 ft., Weight: Line Pipe, Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 200 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3300 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1475, Top: 0 ft., Bottom: 3300 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 10872 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: , Bottom: 10882 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/2/2011 | | Spud Date: | 12/18/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 10090 ft. | Measured PB depth: | 9987 ft. | | True Vertical TD: | 9946 ft. | True Vertical PB depth: | 9842 ft. | | Top PZ Location: | Sec:34 Twp: 7S 95W | Footage: 2231 FSL 688 FEL | | Bottom Hole Location: | Sec:34 Twp: 7S 95W | Footage: 2231 FSL 688 FEL | | Log Types: | CBL, RMT | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 164 ft., Weight: line pipe, Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 164 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3328 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1283, Top: 0 ft., Bottom: 3328 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10080 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1101, Top: 6042 ft., Bottom: 10080 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 234 ft., Sacks: 225, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 7119 ft. | | | | | CAMEO | 9677 ft. | | | | | ROLLINS | 9967 ft. | | | |
Formation CMEO Formation Classification: GW Status: CM - 8/10/2015 Interval Top: 9680 ft. Interval Bottom: 9824 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/15/2013 | Treatment End Date: | 11/18/2013 | | Treatment Summary: | Clean Water: 1635 bbls, Slurry 1719 bbls, 30/50 White Sand 64,100 lbs, 30/50 Prime Plus 17,700 lbs | | Total fluid used in treatment (bbls): | 3354 | Max pressure during treatment (psi): | 8748 | | Total gas used in treatment (mcf): | 110000 | Fluid density (lbs/gal): | 8.48 | | Type Of gas: | CARBON DIOXIDE | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1242 | | Fresh water used in treatment (bbls): | 1635 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 81800 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | Perforation Data: | | Interval Top: | 9680 ft. | # Of Holes: | 24 | | Interval Bottom: | 9824 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: OG Status: PR - 9/1/2024 Interval Top: 9029 ft. Interval Bottom: 9824 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9029 ft. | # Of Holes: | 100 | | Interval Bottom: | 9824 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: OG Status: CM - 8/10/2015 Interval Top: 9029 ft. Interval Bottom: 9625 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/15/2017 | Treatment End Date: | N/A | | Treatment Summary: | 3-20-2014 Williams Fork 9442'-9625'
7-24-2014 Williams Fork 9229'-9397'
11-22-2014 Williams Fork 9029'-9190'
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/22/2014 | Treatment End Date: | 11/22/2014 | | Treatment Summary: | Williams Fork Treatment: 30/50 Premium White Sand 67,400 lbs, 30/50 CRC Sand 18,700 lbs, 3358 bbls Slurry | | Total fluid used in treatment (bbls): | 6610 | Max pressure during treatment (psi): | 5136 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | 0.45 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1451 | | Fresh water used in treatment (bbls): | 3252 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 86100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/24/2014 | Treatment End Date: | 7/24/2014 | | Treatment Summary: | Total water pumped 6197 bbls, Slurry 6368 bbls, 30/50 White Sand 107,980 lbs, 30/50 Prime Plus 27,660 lbs | | Total fluid used in treatment (bbls): | 12565 | Max pressure during treatment (psi): | 8424 | | Total gas used in treatment (mcf): | 55055000 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | CARBON DIOXIDE | Number Of staged intervals: | 3 | | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.52 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 34 | | Fresh water used in treatment (bbls): | 6197 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 135640 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/20/2014 | Treatment End Date: | 3/27/2014 | | Treatment Summary: | Clean water 1981 bbls, Slurry 2109bbls, 30/50 White Sand 60,480 lbs, 30/50 prime plus 15,420 lbs | | Total fluid used in treatment (bbls): | 4090 | Max pressure during treatment (psi): | 8451 | | Total gas used in treatment (mcf): | 55055000 | Fluid density (lbs/gal): | 8.53 | | Type Of gas: | CARBON DIOXIDE | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.69 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1549 | | Fresh water used in treatment (bbls): | 1981 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 75900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 9029 ft. | # Of Holes: | 76 | | Interval Bottom: | 9625 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 22 |
| Total Gas Produced (MCF) | 29373 |
| GOR | 1335136 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.933 |
| Average MCFE per Day | 80.802 |
| Federal Financial Assurance | i | |
|
|