Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19850
Well Classification: GW Status: PR - 3/5/2013
Well Name/No:Savage #RWF 344-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/5/2013
FacilityID:418959LocationID:323938
County:GARFIELD #045Location:SWSE 27 6S94W 6
Field:RULISON - #75400Elevation:5297 ft.
Basin:PICEANCE BASIN  
Planned Location:476FSL  2141 FELLat/Long: 39.490288 / -107.872377Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.490287 / -107.872376Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/15/2013
End Date: 1/15/2013
Reported: 3/16/2013
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/5/2013             Measured TD: 7900 ft.    Vertical TD: 7635 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/5/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/13/2014
Proposed Top PZ Location:Sec:27 Twp: 6S 94W Footage: 255 FSL  621 FEL
Bottom Hole Location:Sec:27 Twp: 6S 94W Footage: 255 FSL  621 FEL
Proposed Depth/Form:7924 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1112 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 383, Top: 0 ft., Bottom: 1112 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7924 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 675, Top: , Bottom: 7924 ft.

Wellbore Completed
Completion Date:9/29/2012
Spud Date:9/20/2012Spud Date Is:ACTUAL
Measured TD:7900 ft.Measured PB depth:7843 ft.
True Vertical TD:7635 ft.True Vertical PB depth:7578 ft.
Top PZ Location:Sec:27 Twp: 6S 94WFootage: 213 FSL  605 FEL
Bottom Hole Location:Sec:27 Twp: 6S 94WFootage: 199 FSL  622 FEL
Log Types:SP/GR/HDIL/ZDL/CN/RPM/CBL/MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1645 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 1645 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7881 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1470, Top: 3590 ft., Bottom: 7881 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1421 ft.
MESAVERDE4009 ft.
CAMEO6844 ft.
ROLLINS7750 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 2/28/2013                 Interval Top: 5683 ft.    Interval Bottom: 7666 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/6/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/27/2012Treatment End Date:1/15/2013
Treatment Summary:3500 Gals 7 ½% HCL; 807900 # 30/50 Sand; 87000 100/Mesh; 25067 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):25150Max pressure during treatment (psi):6646
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):25067Total flowback volume recovered (bbls):12276
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):894900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7461 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1146
CALC_MCF_GAS 935
CASING_PRESS 2033
MCF_GAS 935
TUBING_PRESS 1815
Perforation Data:
Interval Top:5683 ft.# Of Holes:127
Interval Bottom:7666 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)22160
GOR503636
GOR DeterminationMCFE
Average BOE per Day10.594
Average MCFE per Day61.437

 Federal Financial Assurance  i 

 Tribal Well  i No