Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19848
Well Classification: GW Status: PR - 2/17/2013
Well Name/No:Savage #RMV 103-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/17/2013
FacilityID:418955LocationID:323938
County:GARFIELD #045Location:SWSE 27 6S94W 6
Field:RULISON - #75400Elevation:5297 ft.
Basin:PICEANCE BASIN  
Planned Location:451FSL  2170 FELLat/Long: 39.490220 / -107.872477Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.490219 / -107.872476Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/14/2013
End Date: 1/14/2013
Reported: 2/8/2013
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/17/2013             Measured TD: 8008 ft.    Vertical TD: 7575 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/17/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/13/2014
Proposed Top PZ Location:Sec:27 Twp: 6S 94W Footage: 623 FSL  1221 FWL
Bottom Hole Location:Sec:27 Twp: 6S 94W Footage: 623 FSL  1221 FWL
Proposed Depth/Form:8031 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1680 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 456, Top: 0 ft., Bottom: 1680 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8031 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 688, Top: , Bottom: 8031 ft.

Wellbore Completed
Completion Date:8/15/2012
Spud Date:8/5/2012Spud Date Is:ACTUAL
Measured TD:8008 ft.Measured PB depth:7974 ft.
True Vertical TD:7575 ft.True Vertical PB depth:7541 ft.
Top PZ Location:Sec:27 Twp: 6S 94WFootage: 637 FSL  1211 FWL
Bottom Hole Location:Sec:27 Twp: 6S 94WFootage: 628 FSL  1214 FWL
Log Types:RPM CBL AND MUDLOGS
Log Types:RPM/CBL/MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 32, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 1700 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8009 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1450, Top: 3390 ft., Bottom: 8009 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1357 ft.
MESAVERDE4254 ft.
CAMEO6985 ft.
ROLLINS7895 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/17/2013                 Interval Top: 5803 ft.    Interval Bottom: 7770 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/2/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/27/2012Treatment End Date:1/14/2013
Treatment Summary:3500 Gals 7 ½% HCL; 348000 # 30/50 Sand; 79500 100/Mesh; 24322 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):24405Max pressure during treatment (psi):5156
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):24322Total flowback volume recovered (bbls):15544
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):427500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7560 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/17/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1027
CALC_MCF_GAS 820
CASING_PRESS 1978
MCF_GAS 820
TUBING_PRESS 1716
Perforation Data:
Interval Top:5803 ft.# Of Holes:130
Interval Bottom:7770 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)21720
GOR678750
GOR DeterminationMCFE
Average BOE per Day10.350
Average MCFE per Day60.044

 Federal Financial Assurance  i 

 Tribal Well  i No