|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/26/2013 Measured TD: 7975 ft. Vertical TD: 7581 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/26/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/13/2014 | | Proposed Top PZ Location: | Sec:34 Twp: 6S 94W | Footage: 1163 FNL 2182 FWL | | Bottom Hole Location: | Sec:34 Twp: 6S 94W | Footage: 1163 FNL 2182 FWL | | Proposed Depth/Form: | 7947 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1156 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1123 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7947 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 687, Top: , Bottom: 7947 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/26/2012 | | Spud Date: | 7/19/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7975 ft. | Measured PB depth: | 7927 ft. | | True Vertical TD: | 7581 ft. | True Vertical PB depth: | 7533 ft. | | Top PZ Location: | Sec:34 Twp: 6S 94W | Footage: 1145 FNL 2227 FWL | | Bottom Hole Location: | Sec:34 Twp: 6S 94W | Footage: 1166 FNL 2221 FWL | | Log Types: | RPM CBL and MUDLOGS | | Log Types: | RPM/CBL/MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 32, Top: 0 ft., Bottom: 85 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1185 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1185 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7964 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1510, Top: 2750 ft., Bottom: 7964 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1347 ft. | | | | | MESAVERDE | 4517 ft. | | | | | CAMEO | 6930 ft. | | | | | ROLLINS | 7804 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 2/26/2013 Interval Top: 5811 ft. Interval Bottom: 7627 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 1/2/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/27/2012 | Treatment End Date: | 1/2/2013 | | Treatment Summary: | 3500 Gals 7 ½% HCL; 543500 # 30/50 Sand; 246400 100/Mesh; 23176 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 23259 | Max pressure during treatment (psi): | 5817 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 83 | Min frac gradient (psi/ft): | 0.81 | | Recycled water used in treatment (bbls): | 23176 | Total flowback volume recovered (bbls): | 11157 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 789900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7438 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/26/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1049 | | CALC_MCF_GAS | 881 | | CASING_PRESS | 1941 | | MCF_GAS | 881 | | TUBING_PRESS | 1715 |
| | Perforation Data: | | Interval Top: | 5811 ft. | # Of Holes: | 128 | | Interval Bottom: | 7627 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 49 |
| Total Gas Produced (MCF) | 21112 |
| GOR | 430857 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.111 |
| Average MCFE per Day | 58.621 |
| Federal Financial Assurance | i | |
|
|