|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2023 Measured TD: 7780 ft. Vertical TD: 7416 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/11/2016 | | Proposed Top PZ Location: | Sec:9 Twp: 7S 91W | Footage: 2644 FNL 1944 FWL | | Bottom Hole Location: | Sec:9 Twp: 7S 91W | Footage: 2644 FNL 1944 FWL | | Proposed Depth/Form: | 7762 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 191-32 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 191-32 , Unit Acreage: 640, Drill Unit: All | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 191-32 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84# , Citings Type: PLANNED | | Cement: | Sacks: 111, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 32# , Citings Type: PLANNED | | Cement: | Sacks: 289, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7762 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 615, Top: , Bottom: 7762 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/30/2014 | | Spud Date: | 6/20/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 7780 ft. | Measured PB depth: | 7719 ft. | | True Vertical TD: | 7416 ft. | True Vertical PB depth: | 7355 ft. | | Top PZ Location: | Sec:9 Twp: 7S 91W | Footage: 2577 FSL 1969 FWL | | Bottom Hole Location: | Sec:9 Twp: 7S 91W | Footage: 2577 FSL 1969 FWL | | Log Types: | CBL, MUD, PULSED NEUTRON | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1130 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 1130 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7753 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1030, Top: 2378 ft., Bottom: 7753 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3358 ft. | | N | N | | CAMEO | 6257 ft. | | N | N | | ROLLINS | 7514 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 10/1/2023 Interval Top: 5701 ft. Interval Bottom: 7487 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/21/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/1/2014 | Treatment End Date: | 9/10/2014 | | Treatment Summary: | Frac'd with 121,682 bbls 2% slickwater, 71 bbls 7.5% HCL Acid and 1,502,500 lbs of 20/40 sand. | | Total fluid used in treatment (bbls): | 121753 | Max pressure during treatment (psi): | 7739 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.71 | | Recycled water used in treatment (bbls): | 121682 | Total flowback volume recovered (bbls): | 45700 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1502500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6445 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/6/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1155 | | BBLS_OIL | 8 | | BTU_GAS | 1169 | | CALC_BBLS_H2O | 1155 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 153875 | | CALC_MCF_GAS | 1231 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 53 | | MCF_GAS | 1231 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 5701 ft. | # Of Holes: | 324 | | Interval Bottom: | 7487 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 80 |
| Total Gas Produced (MCF) | 30236 |
| GOR | 377950 |
| GOR Determination | MCFE |
| Average BOE per Day | 14.490 |
| Average MCFE per Day | 84.075 |
| Federal Financial Assurance | i | Y |
|
|