|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2023 Measured TD: 8465 ft. Vertical TD: 8178 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/27/2012 | | Proposed Top PZ Location: | Sec:10 Twp: 7S 91W | Footage: 1788 FSL 825 FEL | | Bottom Hole Location: | Sec:10 Twp: 7S 91W | Footage: 1788 FSL 825 FEL | | Proposed Depth/Form: | 8326 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 191-32 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 191-32 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 60 ft., Weight: 55# , Citings Type: PLANNED | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1000 ft., Weight: 24/32# , Citings Type: PLANNED | | Cement: | Sacks: 416, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8326 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 903, Top: , Bottom: 8326 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/10/2010 | | Spud Date: | 9/12/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8465 ft. | Measured PB depth: | 8412 ft. | | True Vertical TD: | 8178 ft. | True Vertical PB depth: | 8126 ft. | | Top PZ Location: | Sec:10 Twp: 7S 91W | Footage: 1787 FSL 799 FEL | | Bottom Hole Location: | Sec:10 Twp: 7S 91W | Footage: 1761 FSL 816 FEL | | Log Types: | Mud log, CBL and Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 84 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1106 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 1110 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8453 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 852, Top: 3530 ft., Bottom: 8465 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4286 ft. | | | | | CAMEO | 6776 ft. | | | | | ROLLINS | 8202 ft. | | | |
Formation RLNS Formation Classification: GW Status: PR - 11/1/2023 Interval Top: 8267 ft. Interval Bottom: 8321 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 11/23/2010 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/10/2010 | | Treatment Summary: | WFILS: 93,922 bbls of 2% KCL slickwater, 381,900 lbs 30/50 sand and 1,567,900 lbs 20/40 sand |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7764 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1619 | | BTU_GAS | 1148 | | CALC_BBLS_H2O | 1619 | | CALC_MCF_GAS | 1868 | | CASING_PRESS | 775 | | MCF_GAS | 1868 | | TUBING_PRESS | 1790 |
| | Perforation Data: | | Interval Top: | 8267 ft. | # Of Holes: | 20 | | Interval Bottom: | 8321 ft. | Hole Size: | 0.42 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 11/1/2023 Interval Top: 6595 ft. Interval Bottom: 8160 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/23/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/15/2010 | | Treatment Summary: | WFILS: 93,922 bbls of 2% KCL slickwater, 381,900 lbs 30/50 sand and 1,567,900 lbs 20/40 sand |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7764 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1619 | | BTU_GAS | 1148 | | CALC_BBLS_H2O | 1619 | | CALC_MCF_GAS | 1868 | | CASING_PRESS | 775 | | MCF_GAS | 1868 | | TUBING_PRESS | 1790 |
| | Perforation Data: | | Interval Top: | 6595 ft. | # Of Holes: | 228 | | Interval Bottom: | 8160 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 112 |
| Total Gas Produced (MCF) | 36883 |
| GOR | 329312 |
| GOR Determination | MCFE |
| Average BOE per Day | 17.726 |
| Average MCFE per Day | 102.815 |
| Federal Financial Assurance | i | Y |
|
|