|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/30/2013 Measured TD: 7035 ft. Vertical TD: 7023 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/30/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/26/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 7S 95W | Footage: 125 FNL 1811 FEL | | Bottom Hole Location: | Sec:9 Twp: 7S 95W | Footage: 107 FNL 1844 FEL | | Proposed Depth/Form: | 7069 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-12 , Unit Acreage: 640, Drill Unit: Section | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 707 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 247, Top: 0 ft., Bottom: 707 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7069 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 553, Top: 3668 ft., Bottom: 7069 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/7/2011 | | Spud Date: | 1/23/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7035 ft. | Measured PB depth: | 6961 ft. | | True Vertical TD: | 7023 ft. | True Vertical PB depth: | 6973 ft. | | Top PZ Location: | Sec:9 Twp: 7S 95W | Footage: 125 FNL 1811 FEL | | Bottom Hole Location: | Sec:9 Twp: 7S 95W | Footage: 107 FNL 1844 FEL | | Log Types: | CBL & RPM,MUD | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: , Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 947 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 947 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 7026 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1200, Top: 5325 ft., Bottom: 7026 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5797 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 4690 ft., Bottom: 5797 ft., Determination Method: CALC | | Additional Cement: | String Type: S.C. 1.1 , Top: 4690 ft., Depth: , Bottom: 5797 ft., Sacks: 630, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1797 ft. | | | | | MESAVERDE | 3821 ft. | | | | | CAMEO | 5968 ft. | | | | | ROLLINS | 6884 ft. | | | |
Formation WFCM Formation Classification: GW Status: AB - 10/30/2013 Interval Top: 4921 ft. Interval Bottom: 6818 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/11/2011 | | Treatment Summary: | 2,376 GALS 7 1/2% HCL; 724,010# 30/50 SAND; 20,606 BBLS SLICKWATER (SUMMARY). |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1057 | | CALC_MCF_GAS | 1078 | | CASING_PRESS | 1316 | | MCF_GAS | 1078 | | TUBING_PRESS | 685 |
| | Perforation Data: | | Interval Top: | 4921 ft. | # Of Holes: | 106 | | Interval Bottom: | 6818 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/30/2013 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|