Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19671
Well Classification: GW Status: PR - 4/16/2011
Well Name/No:ExxonMobil #GM 323-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CA COC67283
Facility Status:PRStatus Date4/16/2011
FacilityID:418055LocationID:323789
County:GARFIELD #045Location:NWSE 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5655 ft.
Basin:PICEANCE BASIN  
Planned Location:1967FSL  1307 FELLat/Long: 39.493332 / -108.089831Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.493332 / -108.089832Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/12/2011
End Date: 2/12/2011
Reported: 5/3/2012
Prior to rule 205A.b.(2)(A)
Days to report: 446
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/16/2011             Measured TD: 8196 ft.    Vertical TD: 7133 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/16/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/28/2012
Proposed Top PZ Location:Sec:26 Twp: 6S 96W Footage: 1819 FSL  1550 FWL
Bottom Hole Location:Sec:26 Twp: 6S 96W Footage: 1819 FSL  1550 FWL
Proposed Depth/Form:7945 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-17 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1375 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 480, Top: 0 ft., Bottom: 1375 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7945 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 578, Top: , Bottom: 7945 ft.

Wellbore Completed
Completion Date:12/29/2010
Spud Date:12/21/2010Spud Date Is:ACTUAL
Measured TD:8196 ft.Measured PB depth:8149 ft.
True Vertical TD:7133 ft.True Vertical PB depth:7086 ft.
Top PZ Location:Sec:26 Twp: 6S 96WFootage: 1857 FSL  1792 FWL
Bottom Hole Location:Sec:26 Twp: 6S 96WFootage: 1853 FSL  1787 FWL
Log Types:CBL AND RESERVOIR PERFORMANCE MONITOR (RPM) Mud
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 86 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 32, Top: 0 ft., Bottom: 86 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1404 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1404 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8180 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 3150 ft., Bottom: 8180 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2466 ft.
MESAVERDE4969 ft.
CAMEO7626 ft.
ROLLINS8084 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/18/2011                 Interval Top: 6194 ft.    Interval Bottom: 8001 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/16/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/12/2011
Treatment Summary:3,503 GALS OF 7.5% HCL; 1,105,789# OF 30/50 SAND; 51,047 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7736 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/18/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1092
CASING_PRESS 2135
MCF_GAS 978
TUBING_PRESS 1598
Perforation Data:
Interval Top:6194 ft.# Of Holes:138
Interval Bottom:8001 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)48
Total Gas Produced (MCF)22534
GOR469458
GOR DeterminationMCFE
Average BOE per Day10.783
Average MCFE per Day62.526

 Federal Financial Assurance  i 

 Tribal Well  i No