Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19547
Well Classification: GW Status: PR - 9/13/2012
Well Name/No:Federal #PA 313-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62162
Facility Status:PRStatus Date9/13/2012
FacilityID:417478LocationID:335238
County:GARFIELD #045Location:SESW 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5675 ft.
Basin:PICEANCE BASIN  
Planned Location:605FSL  2233 FWLLat/Long: 39.489914 / -108.023180Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.489919 / -108.023178Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/22/2012
End Date: 6/22/2012
Reported: 4/22/2013
Days to report: 304
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/13/2012             Measured TD: 8051 ft.    Vertical TD: 7505 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/13/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/24/2012
Proposed Top PZ Location:Sec:29 Twp: 6S 95W Footage: 2002 FSL  632 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 2002 FSL  632 FWL
Proposed Depth/Form:7937 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 2316 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 808, Top: 0 ft., Bottom: 2316 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7937 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 608, Top: 4198 ft., Bottom: 7937 ft.

Wellbore Completed
Completion Date:4/6/2012
Spud Date:3/30/2012Spud Date Is:ACTUAL
Measured TD:8051 ft.Measured PB depth:7824 ft.
True Vertical TD:7505 ft.True Vertical PB depth:7278 ft.
Top PZ Location:Sec:29 Twp: 6s 95wFootage: 2162 FSL  655 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95wFootage: 2156 FSL  650 FWL
Log Types:CBL/RPM?MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2191 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 2191 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 3450 ft., Bottom: 8037 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2119 ft.
MESAVERDE4539 ft.
CAMEO7315 ft.
ROLLINS7965 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/23/2013                 Interval Top: 5712 ft.    Interval Bottom: 7882 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/19/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/19/2012Treatment End Date:6/22/2012
Treatment Summary:1103750#40/70 Sand; 29982 Bbls Slickwater; (Summary)*All flowback water entries are total estimates based on comingled volumes. The treatment amounts were updated as some were left off the original completion. Original document #400320295.
Total fluid used in treatment (bbls):29982Max pressure during treatment (psi):5893
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):29982Total flowback volume recovered (bbls):6579
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1103750Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7674 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/30/2012Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1069
CALC_MCF_GAS 657
CASING_PRESS 1504
MCF_GAS 657
TUBING_PRESS 1009
Perforation Data:
Interval Top:5712 ft.# Of Holes:153
Interval Bottom:7882 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)24822
GOR620550
GOR DeterminationMCFE
Average BOE per Day11.832
Average MCFE per Day68.614

 Federal Financial Assurance  i Y

 Tribal Well  i No