Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19533
Well Classification: GW Status: PR - 8/24/2012
Well Name/No:Federal #PA 514-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62162
Facility Status:PRStatus Date8/24/2012
FacilityID:417453LocationID:335238
County:GARFIELD #045Location:SESW 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5675 ft.
Basin:PICEANCE BASIN  
Planned Location:597FSL  2246 FWLLat/Long: 39.489893 / -108.023135Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.489896 / -108.023133Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/22/2012
End Date: 6/22/2012
Reported: 8/9/2012
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/24/2012             Measured TD: 7605 ft.    Vertical TD: 7465 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/24/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/24/2012
Proposed Top PZ Location:Sec:29 Twp: 6S 95W Footage: 1040 FSL  1237 FWL
Bottom Hole Location:Sec:29 Twp: 6S 29W Footage: 1040 FSL  1237 FWL
Proposed Depth/Form:7609 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit: Unspaced
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 2162 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 0 ft., Bottom: 2162 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7608 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 601, Top: 5259 ft., Bottom: 7608 ft.

Wellbore Completed
Completion Date:3/20/2012
Spud Date:3/12/2012Spud Date Is:ACTUAL
Measured TD:7605 ft.Measured PB depth:7558 ft.
True Vertical TD:7465 ft.True Vertical PB depth:7418 ft.
Top PZ Location:Sec:29 Twp: 6S 95WFootage: 947 FSL  1198 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95WFootage: 947 FSL  1196 FWL
Log Types:SP/GR/HDIL/ZDL/CN/CBL/RPM/MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2228 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 2228 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7591 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 2830 ft., Bottom: 7591 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1991 ft.
MESAVERDE4073 ft.
CAMEO6810 ft.
ROLLINS7532 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/24/2012                 Interval Top: 5190 ft.    Interval Bottom: 7431 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/23/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/18/2012Treatment End Date:6/22/2012
Treatment Summary:1128100# 40/70 Sand; 29566 BBL's Slickwater
Total fluid used in treatment (bbls):29566Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):29566Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1128100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7188 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/24/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1089
CALC_MCF_GAS 800
CASING_PRESS 1210
MCF_GAS 800
TUBING_PRESS 1007
Perforation Data:
Interval Top:5190 ft.# Of Holes:159
Interval Bottom:7431 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)36
Total Gas Produced (MCF)23787
GOR660750
GOR DeterminationMCFE
Average BOE per Day11.342
Average MCFE per Day65.751

 Federal Financial Assurance  i Y

 Tribal Well  i No