Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19525
Well Classification: GW Status: PR - 8/21/2012
Well Name/No:Federal #PA 13-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62162
Facility Status:PRStatus Date8/21/2012
FacilityID:417431LocationID:335238
County:GARFIELD #045Location:SESW 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5675 ft.
Basin:PICEANCE BASIN  
Planned Location:602FSL  2258 FWLLat/Long: 39.489906 / -108.023093Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.489908 / -108.023092Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/22/2012
End Date: 6/22/2012
Reported: 8/9/2012
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/21/2012             Measured TD: 7960 ft.    Vertical TD: 7544 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/21/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/24/2012
Proposed Top PZ Location:Sec:29 Twp: 6S 95W Footage: 1687 FSL  599 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 1687 FSL  599 FWL
Proposed Depth/Form:7857 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 2292 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 2292 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7857 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 609, Top: 4114 ft., Bottom: 7857 ft.

Wellbore Completed
Completion Date:3/11/2012
Spud Date:3/3/2012Spud Date Is:ACTUAL
Measured TD:7960 ft.Measured PB depth:7911 ft.
True Vertical TD:7544 ft.True Vertical PB depth:7495 ft.
Top PZ Location:Sec:29 Twp: 6S 95WFootage: 1854 FSL  782 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95WFootage: 1859 FSL  760 FWL
Log Types:SP/GR/HDIL/ZDL/CN and CBL/ SONIC/ MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2366 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 0 ft., Bottom: 2366 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7945 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1033, Top: 3090 ft., Bottom: 7945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2076 ft.
MESAVERDE4419 ft.
CAMEO7215 ft.
ROLLINS7833 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2012                 Interval Top: 5566 ft.    Interval Bottom: 7748 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/19/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/18/2012Treatment End Date:6/22/2012
Treatment Summary:1146271# 40/70 Sand / 27687.2 BBL's Slickwater
Total fluid used in treatment (bbls):27687Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):27687Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1146271Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7562 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1082
CALC_MCF_GAS 887
CASING_PRESS 1366
MCF_GAS 887
TUBING_PRESS 1071
Perforation Data:
Interval Top:5566 ft.# Of Holes:160
Interval Bottom:7748 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)15823
GOR632920
GOR DeterminationMCFE
Average BOE per Day7.544
Average MCFE per Day43.774

 Federal Financial Assurance  i Y

 Tribal Well  i No