Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19307
Well Classification: GW Status: PR - 12/2/2013
Well Name/No:Williams #GM 313-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/2/2013
FacilityID:416561LocationID:335302
County:GARFIELD #045Location:NESW 34 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5356 ft.
Basin:PICEANCE BASIN  
Planned Location:1962FSL  2153 FWLLat/Long: 39.478661 / -108.096258Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.478661 / -108.096257Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/4/2013
End Date: 9/7/2013
Reported: 9/26/2013
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/2/2013             Measured TD: 6661 ft.    Vertical TD: 6440 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/2/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2013
Proposed Top PZ Location:Sec:34 Twp: 6S 96W Footage: 1681 FSL  848 FWL
Bottom Hole Location:Sec:34 Twp: 6S 96W Footage: 1681 FSL  848 FWL
Proposed Depth/Form:6669 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-11 , Unit Acreage: 160, Drill Unit: SW/4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 314, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6669 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 542, Top: , Bottom: 6669 ft.

Wellbore Completed
Completion Date:8/12/2013
Spud Date:8/6/2013Spud Date Is:ACTUAL
Measured TD:6661 ft.Measured PB depth:6616 ft.
True Vertical TD:6440 ft.True Vertical PB depth:6395 ft.
Top PZ Location:Sec:34 Twp: 6S 96WFootage: 1696 FSL  876 FWL
Bottom Hole Location:Sec:34 Twp: 6S 96WFootage: 1679 FSL  880 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 943 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 943 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6650 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 955, Top: 3235 ft., Bottom: 6650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1730 ft.
MESAVERDE3542 ft.
CAMEO6081 ft.
ROLLINS6543 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 10/31/2013                Interval Top: 5007 ft.    Interval Bottom: 6441 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/6/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/4/2013Treatment End Date:9/7/2013
Treatment Summary:688000#40/70 Sand; 18494 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):18494Max pressure during treatment (psi):5416
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):18494Total flowback volume recovered (bbls):7350
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):688000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6312 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2013Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1096
CALC_MCF_GAS 610
CASING_PRESS 675
MCF_GAS 610
TUBING_PRESS 427
Perforation Data:
Interval Top:5007 ft.# Of Holes:134
Interval Bottom:6441 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15749
GOR828894
GOR DeterminationMCFE
Average BOE per Day7.495
Average MCFE per Day43.473

 Federal Financial Assurance  i 

 Tribal Well  i No