|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/10/2014 Measured TD: 9410 ft. Vertical TD: 9297 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/10/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/2/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 2101 FSL 1947 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 2101 FSL 1947 FWL | | Proposed Depth/Form: | 9442 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 510-44 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2990 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1110, Top: 0 ft., Bottom: 2990 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9442 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 537, Top: 5718 ft., Bottom: 9442 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/23/2014 | | Spud Date: | 8/2/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 9410 ft. | Measured PB depth: | 9346 ft. | | True Vertical TD: | 9297 ft. | True Vertical PB depth: | 9233 ft. | | Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 2131 FSL 1897 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 2124 FSL 1923 FWL | | Log Types: | SP/GR/HDIL/ZDL/CN/CBL/MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3020 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1760, Top: 0 ft., Bottom: 3020 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9397 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1170, Top: 3185 ft., Bottom: 9397 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4281 ft. | | | | | MESAVERDE | 5802 ft. | | | | | CAMEO | 8082 ft. | | | | | ROLLINS | 8510 ft. | | | | | COZZETTE | 8691 ft. | | | | | CORCORAN | 8939 ft. | | | |
Formation CRCRN Formation Classification: GW Status: PR - 3/27/2015 Interval Top: 8948 ft. Interval Bottom: 9168 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/16/2014 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/4/2014 | Treatment End Date: | 10/4/2014 | | Treatment Summary: | 410 Gals 7 ½% HCL; 3548 Bbls Slickwater; 125200 # 40/70 Sand; 10500 # 20/40 Sand (Summary) | | Total fluid used in treatment (bbls): | 3558 | Max pressure during treatment (psi): | 4987 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 9 | Min frac gradient (psi/ft): | 0.55 | | Recycled water used in treatment (bbls): | 3548 | Total flowback volume recovered (bbls): | 8285 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 135700 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 8948 ft. | # Of Holes: | 24 | | Interval Bottom: | 9168 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 3/27/2015 Interval Top: 8746 ft. Interval Bottom: 8894 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 10/16/2014 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/4/2014 | Treatment End Date: | 10/4/2014 | | Treatment Summary: | 470 Gals 7 ½% HCL; 138853 Bbls Slickwater; 116800 # 40/70 Sand; 8300 # 20/40 Sand (Summary) | | Total fluid used in treatment (bbls): | 3317 | Max pressure during treatment (psi): | 4987 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.55 | | Recycled water used in treatment (bbls): | 3306 | Total flowback volume recovered (bbls): | 8285 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 125100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8746 ft. | # Of Holes: | 24 | | Interval Bottom: | 8894 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 3/27/2015 Interval Top: 7591 ft. Interval Bottom: 8481 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/16/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/5/2014 | Treatment End Date: | 10/7/2014 | | Treatment Summary: | 2050 Gals 7 ½% HCL; 11535 Bbls Slickwater; 418800 # 40/70 Sand; 31200 # 20/40 Sand (Summary) | | Total fluid used in treatment (bbls): | 11584 | Max pressure during treatment (psi): | 4987 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.55 | | Recycled water used in treatment (bbls): | 11535 | Total flowback volume recovered (bbls): | 8285 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 450000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 7591 ft. | # Of Holes: | 92 | | Interval Bottom: | 8481 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 11/30/2014 Interval Top: 7591 ft. Interval Bottom: 9168 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 10/16/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/4/2014 | Treatment End Date: | 10/7/2014 | | Treatment Summary: | 2930 Gals 7 ½% HCL; 18391 Bbls Slickwater; 660800 # 40/70 Sand; 50000 # 20/40 Sand (Summary) | | Total fluid used in treatment (bbls): | 18460 | Max pressure during treatment (psi): | 4987 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 69 | Min frac gradient (psi/ft): | 0.55 | | Recycled water used in treatment (bbls): | 18390 | Total flowback volume recovered (bbls): | 8285 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 710800 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8997 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1078 | | CALC_MCF_GAS | 367 | | CASING_PRESS | 946 | | MCF_GAS | 367 | | TUBING_PRESS | 570 |
| | Perforation Data: | | Interval Top: | 7591 ft. | # Of Holes: | 140 | | Interval Bottom: | 9168 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 83 |
| Total Gas Produced (MCF) | 30865 |
| GOR | 371867 |
| GOR Determination | MCFE |
| Average BOE per Day | 14.809 |
| Average MCFE per Day | 85.883 |
| Federal Financial Assurance | i | |
|
|