|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2021 Measured TD: 12515 ft. Vertical TD: 12390 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/19/2012 | | Proposed Top PZ Location: | Sec:25 Twp: 4S 96W | Footage: 2288 FNL 1999 FEL | | Bottom Hole Location: | Sec:25 Twp: 4S 96W | Footage: 2288 FNL 1999 FEL | | Proposed Depth/Form: | 13840 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Story Gulch Unt | Unit Number: | COC69333X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: 10, Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 120 ft., Weight: Line Pipe, Citings Type: PLANNED | | Cement: | Sacks: 176, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 2069, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 8.75 in., Top: , Depth: 13840 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 857, Top: 8180 ft., Bottom: 13840 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/11/2010 | | Spud Date: | 4/23/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12515 ft. | Measured PB depth: | 12480 ft. | | True Vertical TD: | 12390 ft. | True Vertical PB depth: | 12355 ft. | | Top PZ Location: | Sec:25 Twp: 4S 96W | Footage: 2288 FNL 1999 FEL | | Bottom Hole Location: | Sec:25 Twp: 4S 96W | Footage: 2304 FNL 1995 FEL | | Log Types: | RST, CBL (included in Triple Combo) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 53 , Citings Type: ACTUAL | | Cement: | Sacks: 207, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3010 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1108, Top: 0 ft., Bottom: 3010 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10532 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 3309, Top: 3100 ft., Bottom: 12515 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 7.875 in., Size: 3.5 in., Top: 10162 ft., Depth: 12515 ft., Weight: 9.20 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 8391 ft. | 12299 ft. | N | N | | ROLLINS | 12300 ft. | 12515 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 2/1/2021 Interval Top: 8785 ft. Interval Bottom: 12197 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 10/15/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/22/2012 | Treatment End Date: | 7/3/2012 | | Treatment Summary: | Stages 1-11 treated with a total of: 250,316 bbls of Slickwater, 4,000 bbls of 100 Sand. | | Total fluid used in treatment (bbls): | 250316 | Max pressure during treatment (psi): | 6480 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 11 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.72 | | Recycled water used in treatment (bbls): | 250316 | Total flowback volume recovered (bbls): | 12085 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 4000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/22/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 73 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 73 | | CALC_MCF_GAS | 3718 | | CASING_PRESS | 1594 | | MCF_GAS | 3718 |
| | Perforation Data: | | Interval Top: | 8785 ft. | # Of Holes: | 750 | | Interval Bottom: | 12197 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 53 |
| Total Gas Produced (MCF) | 13920 |
| GOR | 262641 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.724 |
| Average MCFE per Day | 39.012 |
| Federal Financial Assurance | i | Y |
|
|