|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/25/2011 Measured TD: 12910 ft. Vertical TD: 12349 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/25/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/19/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 4S 96W | Footage: 489 FSL 707 FWL | | Bottom Hole Location: | Sec:24 Twp: 4S 96W | Footage: 489 FSL 707 FWL | | Proposed Depth/Form: | 14315 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Story Gulch Unt | Unit Number: | COC69333X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: 10, Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 120 ft., Weight: Line Pipe, Citings Type: PLANNED | | Cement: | Sacks: 176, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 2069, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 14315 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 857, Top: 8655 ft., Bottom: 14315 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/11/2010 | | Spud Date: | 4/26/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12910 ft. | Measured PB depth: | 12853 ft. | | True Vertical TD: | 12349 ft. | True Vertical PB depth: | 12292 ft. | | Top PZ Location: | Sec:24 Twp: 4S 96W | Footage: 432 FSL 740 FWL | | Bottom Hole Location: | Sec:24 Twp: 4S 96W | Footage: 486 FSL 700 FWL | | Log Types: | CMT Bond Log, RST and Mud, Uploaded CBL and RST in one LAS file identifid as Cement bond log. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 53 , Citings Type: ACTUAL | | Cement: | Sacks: 207, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3015 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1108, Top: 0 ft., Bottom: 3015 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12878 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 2479, Top: 6020 ft., Bottom: 12878 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 8853 ft. | 12788 ft. | | | | ROLLINS | 12789 ft. | 12910 ft. | | |
Formation WMFK Formation Classification: GW Status: PR - 3/25/2011 Interval Top: 8870 ft. Interval Bottom: 12600 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 3/16/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/12/2011 | | Treatment Summary: | Stages 01-11 treated with a total of: 88771 bbls of Slickwater, 45540 lbs 100 Sand, 482322 lbs 20-40 Sand, 70901 lbs 30-50 Sand. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11328 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1760 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 1760 | | CALC_MCF_GAS | 4377 | | CASING_PRESS | 2945 | | MCF_GAS | 4377 | | TUBING_PRESS | 944 |
| | Perforation Data: | | Interval Top: | 8870 ft. | # Of Holes: | 330 | | Interval Bottom: | 12600 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 110 |
| Total Gas Produced (MCF) | 28747 |
| GOR | 261336 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.900 |
| Average MCFE per Day | 80.610 |
| Federal Financial Assurance | i | Y |
|
|