|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/17/2011 Measured TD: 9480 ft. Vertical TD: 8804 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/17/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/5/2011 | | Proposed Top PZ Location: | Sec:22 Twp: 5S 96W | Footage: 982 FNL 387 FWL | | Bottom Hole Location: | Sec:22 Twp: 5S 96W | Footage: 982 FNL 387 FWL | | Proposed Depth/Form: | 11182 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: , Depth: 90 ft., Weight: Line pipe, Citings Type: PLANNED | | Cement: | Sacks: 8, Top: , Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 330, Top: , Bottom: 1750 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 11182 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 931, Top: , Bottom: 11182 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/15/2010 | | Spud Date: | 8/9/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 9480 ft. | Measured PB depth: | 9435 ft. | | True Vertical TD: | 8804 ft. | True Vertical PB depth: | 8759 ft. | | Top PZ Location: | Sec:22 Twp: 5S 96W | Footage: 958 FNL 378 FWL | | Bottom Hole Location: | Sec:22 Twp: 5S 96W | Footage: 1003 FNL 353 FWL | | Log Types: | RST, CBL (Triple Combo) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1819 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 396, Top: 0 ft., Bottom: 1819 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.2 in., Top: 0 ft., Depth: 9458 ft., Weight: 12 , Citings Type: ACTUAL | | Cement: | Sacks: 1334, Top: 2730 ft., Bottom: 9480 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 5937 ft. | 9364 ft. | N | N | | ROLLINS | 9364 ft. | 9480 ft. | N | N |
Formation WMFK Formation Classification: OW Status: PR - 6/17/2011 Interval Top: 6073 ft. Interval Bottom: 9308 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 6/10/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/11/2011 | | Treatment Summary: | Stages 1-12 treated with a total of: 103,038 bbls of Slickwater. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8221 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/17/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 88 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 88 | | CALC_MCF_GAS | 859 | | CASING_PRESS | 1779 | | MCF_GAS | 859 | | TUBING_PRESS | 458 |
| | Perforation Data: | | Interval Top: | 6073 ft. | # Of Holes: | 360 | | Interval Bottom: | 9308 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 229 |
| Total Gas Produced (MCF) | 41976 |
| GOR | 183301 |
| GOR Determination | MCFE |
| Average BOE per Day | 20.457 |
| Average MCFE per Day | 118.633 |
| Federal Financial Assurance | i | |
|
|