|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2018 Measured TD: 8726 ft. Vertical TD: 8711 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/21/2016 | | Proposed Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 719 FNL 1775 FEL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 719 FNL 1775 FEL | | Proposed Depth/Form: | 8736 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 139-16 , Unit Acreage: 640, Drill Unit: ALL | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 34, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1144 ft., Weight: 32 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1144 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8736 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1405, Top: , Bottom: 8736 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/18/2010 | | Spud Date: | 5/7/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8726 ft. | Measured PB depth: | 8680 ft. | | True Vertical TD: | 8711 ft. | True Vertical PB depth: | 8665 ft. | | Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 716 FNL 1764 FEL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 711 FNL 1764 FEL | | Log Types: | SP/GR/HDIL/ZDL/CN, MUD AND CBL | | Log Types: | RPM/CBL/MUD/Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 34, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1144 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1144 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8711 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1405, Top: 1741 ft., Bottom: 8711 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1418 ft. | | | | | WILLIAMS FORK | 3934 ft. | | | | | MESAVERDE | 3934 ft. | | | | | CAMEO | 6750 ft. | | | | | ROLLINS | 7556 ft. | | | | | COZZETTE | 8098 ft. | | | | | CORCORAN | 8393 ft. | | | |
Formation CRCRN Formation Classification: OG Status: PR - 6/1/2018 Interval Top: 8417 ft. Interval Bottom: 8499 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 6/23/2010 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/22/2010 | | Treatment Summary: | 500 Gals 7.5% HCL; 2181 BBLs Slickwater; 79000 20/40 Sand; (summary)
| | Formation Treatment | | Treatment Date: | 6/21/2010 | | Treatment Summary: | 500 GALS 7 1/2% HCL; 79000 # 20/40 SAND; 2181 BBLS SLICKWATER (SUMMRY). |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1143 | | CASING_PRESS | 990 | | MCF_GAS | 734 | | TUBING_PRESS | 817 |
| | Perforation Data: | | Interval Top: | 8417 ft. | # Of Holes: | 19 | | Interval Bottom: | 8499 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OG Status: PR - 6/1/2018 Interval Top: 8104 ft. Interval Bottom: 8263 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 9/16/2010 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2010 | | Treatment Summary: | 500 Gals 7.5% HCL; 4207 BBLs Slickwater; 148833 20/40 Sand; (summary)
| | Formation Treatment | | Treatment Date: | 6/21/2010 | | Treatment Summary: | 500 GALS 7 1/2% HCL; 14833 # 20/40 SAND; 4206 BBLS SLICKWATER (SUMMARY) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1143 | | CASING_PRESS | 990 | | MCF_GAS | 734 | | TUBING_PRESS | 817 |
| | Perforation Data: | | Interval Top: | 8104 ft. | # Of Holes: | 24 | | Interval Bottom: | 8263 ft. | Hole Size: | 0.35 in. |
|
Formation ILES Formation Classification: OG Status: CM - 7/31/2010 Interval Top: 8104 ft. Interval Bottom: 8499 ft.| Completed Information for Formation ILES | | 1st Production Date: | 6/23/2010 | Choke Size: | | | Formation Name: | ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/21/2010 | | Treatment Summary: | 1000 Gals 7 ½% HCL; 93833 # 20/40 Sand; 6387 Bbls Slickwater (Summary) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8202 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/31/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1143 | | CALC_MCF_GAS | 734 | | CASING_PRESS | 990 | | MCF_GAS | 734 | | TUBING_PRESS | 817 |
| | Perforation Data: | | Interval Top: | 8104 ft. | # Of Holes: | 43 | | Interval Bottom: | 8499 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCC Formation Classification: OG Status: CM - 11/30/2014 Interval Top: 5555 ft. Interval Bottom: 8499 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN | | 1st Production Date: | 6/23/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/22/2010 | | Treatment Summary: | 2627 Gals 7 ½% HCL; 33292 Bbls Slickwater; 939900 # 40/70 Sand; 227833 # 20/40 Sand (Summary)
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7274 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1106 | | CALC_MCF_GAS | 896 | | CASING_PRESS | 1485 | | MCF_GAS | 896 | | TUBING_PRESS | 785 |
| | Perforation Data: | | Interval Top: | 5555 ft. | # Of Holes: | 235 | | Interval Bottom: | 8499 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OG Status: PR - 3/16/2017 Interval Top: 5555 ft. Interval Bottom: 7469 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 6/23/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/26/2014 | Treatment End Date: | 10/28/2014 | | Treatment Summary: | 1627 Gals 7 ½% HCL; 26904 Bbls Slickwater; 939900 # 40/70 Sand; (Summary)
| | Total fluid used in treatment (bbls): | 26943 | Max pressure during treatment (psi): | 7634 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 39 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 26904 | Total flowback volume recovered (bbls): | 12489 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 939900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 5555 ft. | # Of Holes: | 192 | | Interval Bottom: | 7469 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 38 |
| Total Gas Produced (MCF) | 25632 |
| GOR | 674526 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.216 |
| Average MCFE per Day | 70.830 |
| Federal Financial Assurance | i | |
|
|