|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2022 Measured TD: 7365 ft. Vertical TD: 7219 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/26/2011 | | Proposed Top PZ Location: | Sec:16 Twp: 6S 96W | Footage: 2338 FNL 395 FWL | | Bottom Hole Location: | Sec:16 Twp: 6S 96W | Footage: 2338 FNL 395 FWL | | Proposed Depth/Form: | 9140 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: , Depth: 90 ft., Weight: Line Pipe, Citings Type: PLANNED | | Cement: | Sacks: 8, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1300 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 253, Top: 0 ft., Bottom: 1300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9140 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 623, Top: , Bottom: 9140 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/10/2011 | | Spud Date: | 2/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7365 ft. | Measured PB depth: | 7326 ft. | | True Vertical TD: | 7219 ft. | True Vertical PB depth: | 7180 ft. | | Top PZ Location: | Sec:16 Twp: 6S 96W | Footage: 2382 FNL 117 FWL | | Bottom Hole Location: | Sec:16 Twp: 6S 96W | Footage: 2410 FNL 95 FWL | | Log Types: | RST, CBL (included in triple combo) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 182 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 182 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1709 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 383, Top: 0 ft., Bottom: 1709 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7350 ft., Weight: 12 , Citings Type: ACTUAL | | Cement: | Sacks: 975, Top: 1463 ft., Bottom: 7350 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4129 ft. | 7250 ft. | N | N | | ROLLINS | 7250 ft. | 7365 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 7/1/2022 Interval Top: 4095 ft. Interval Bottom: 7162 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 6/14/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/3/2011 | | Treatment Summary: | Stages 1-10 treated with a total of 120,622 bbls of Slickwater. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6121 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 124 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 124 | | CALC_MCF_GAS | 1566 | | CASING_PRESS | 1792 | | MCF_GAS | 1566 | | TUBING_PRESS | 701 |
| | Perforation Data: | | Interval Top: | 4095 ft. | # Of Holes: | 300 | | Interval Bottom: | 7162 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 90 |
| Total Gas Produced (MCF) | 16666 |
| GOR | 185177 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.122 |
| Average MCFE per Day | 47.115 |
| Federal Financial Assurance | i | |
|
|