|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/31/2011 Measured TD: 9381 ft. Vertical TD: 9273 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/31/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/3/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 1801 FNL 643 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 1800 FNL 660 FEL | | Proposed Depth/Form: | 9385 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-21 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1480, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9385 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 4385 ft., Bottom: 9385 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/2/2011 | | Spud Date: | 3/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 9381 ft. | Measured PB depth: | 9329 ft. | | True Vertical TD: | 9273 ft. | True Vertical PB depth: | 9222 ft. | | Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 1804 FNL 623 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 1805 FNL 663 FEL | | Log Types: | PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2182 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1852, Top: 0 ft., Bottom: 2182 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9354 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 2160 ft., Bottom: 9354 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4514 ft. | | | | | FORT UNION | 4898 ft. | | | | | WILLIAMS FORK | 6173 ft. | | | | | CAMEO | 8588 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 12/14/2011 Interval Top: 7394 ft. Interval Bottom: 8827 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/1/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/23/2011 | | Treatment Summary: | Frac'd using 36688 bbls of slickwater gel, 667000 lbs of 30/50 mesh Tejas Gold |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8718 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 82 | | BBLS_OIL | 2 | | BTU_GAS | 1078 | | CALC_BBLS_H2O | 82 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 570000 | | CALC_MCF_GAS | 1140 | | CASING_PRESS | 1077 | | GRAVITY_OIL | 59 | | MCF_GAS | 1140 | | TUBING_PRESS | 721 |
| | Perforation Data: | | Interval Top: | 7394 ft. | # Of Holes: | 153 | | Interval Bottom: | 8827 ft. | Hole Size: | 0.3125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 76 |
| Total Gas Produced (MCF) | 21690 |
| GOR | 285394 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.477 |
| Average MCFE per Day | 60.792 |
| Federal Financial Assurance | i | |
|
|