Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18589
Well Classification: GW Status: PR - 9/1/2025
Well Name/No:PUCKETT #32D-24D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:412766LocationID:413481
County:GARFIELD #045Location:SWNE 24 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8257 ft.
Basin:PICEANCE BASIN  
Planned Location:1549FNL  1789 FELLat/Long: 39.511414 / -108.165756Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.511420 / -108.165780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2025             Measured TD: 9264 ft.    Vertical TD: 9195 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/3/2012
Proposed Top PZ Location:Sec:24 Twp: 6S 97W Footage: 2433 FNL  1961 FEL
Bottom Hole Location:Sec:24 Twp: 6S 97W Footage: 2460 FNL  1980 FEL
Proposed Depth/Form:9265 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1480, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9265 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 4265 ft., Bottom: 9265 ft.

Wellbore Completed
Completion Date:2/4/2011
Spud Date:1/23/2011Spud Date Is:ACTUAL
Measured TD:9264 ft.Measured PB depth:8969 ft.
True Vertical TD:9195 ft.True Vertical PB depth:8899 ft.
Top PZ Location:Sec:24 Twp: 6S 97WFootage: 2419 FNL  1945 FEL
Bottom Hole Location:Sec:24 Twp: 6S 97WFootage: 2438 FNL  1994 FEL
Log Types:PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2542 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 2274, Top: 0 ft., Bottom: 2542 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9172 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 3438 ft., Bottom: 9065 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4450 ft.
FORT UNION4848 ft.
WILLIAMS FORK6043 ft.
CAMEO8652 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2025                  Interval Top: 7352 ft.    Interval Bottom: 8751 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/1/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/16/2011
Treatment Summary:Frac'd 6 stages using 29895 bbls of slickwater gel, 610059 lbs of 30/50 mesh Tejas Gold
Tubing Size:2.375 in.Tubing Setting Depth:8597 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2011Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
BBLS_OIL 2
BTU_GAS 1090
CALC_BBLS_H2O 57
CALC_BBLS_OIL 2
CALC_GOR 364500
CALC_MCF_GAS 729
CASING_PRESS 692
GRAVITY_OIL 59
MCF_GAS 729
TUBING_PRESS 454
Perforation Data:
Interval Top:7352 ft.# Of Holes:153
Interval Bottom:8751 ft.Hole Size:0.3125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)9662
GOR254263
GOR DeterminationMCFE
Average BOE per Day4.663
Average MCFE per Day27.024

 Federal Financial Assurance  i 

 Tribal Well  i No