Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18415
Well Classification: GW Status: PR - 7/31/2010
Well Name/No:FEDERAL #PA 544-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date7/31/2010
FacilityID:411924LocationID:335275
County:GARFIELD #045Location:SWNE 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5561 ft.
Basin:PICEANCE BASIN  
Planned Location:1921FNL  1733 FELLat/Long: 39.497219 / -107.999908Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.497283 / -107.999983Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2010             Measured TD: 8723 ft.    Vertical TD: 8182 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2010
Wellbore PermitDIRECTIONAL
Permit #:20090747 Expiration Date:4/19/2010
Proposed Top PZ Location:Sec: Twp: Footage: 210 FSL  269 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 210 FSL  269 FEL
Proposed Depth/Form:8131 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/31/2009
Spud Date:12/24/2009Spud Date Is:ACTUAL
Measured TD:8723 ft.Measured PB depth:8572 ft.
True Vertical TD:8182 ft.True Vertical PB depth:8031 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 186 FSL  259 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 228 FSL  429 FEL
Log Types:CBL; MUD
Log Types:CBL; RPM
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2568 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 0 ft., Bottom: 2568 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8602 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 3798 ft., Bottom: 8602 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2318 ft.
WASATCH G2318 ft.NN
MESAVERDE4929 ft.
CAMEO7779 ft.
ROLLINS8597 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2010                 Interval Top: 6480 ft.    Interval Bottom: 8461 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/23/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/23/2010
Treatment Summary:4502 GALS 7 1/2% HCL; 1052600# 30/50 SAND; 29690 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:8116 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1067
CASING_PRESS 1620
MCF_GAS 996
TUBING_PRESS 1385
Perforation Data:
Interval Top:6480 ft.# Of Holes:144
Interval Bottom:8461 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)24208
GOR550181
GOR DeterminationMCFE
Average BOE per Day11.558
Average MCFE per Day67.014

 Federal Financial Assurance  i Y

 Tribal Well  i No