Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18403
Well Classification: GW Status: PR - 7/31/2010
Well Name/No:FEDERAL #PA 432-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date7/31/2010
FacilityID:411912LocationID:335275
County:GARFIELD #045Location:SWNE 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5557 ft.
Basin:PICEANCE BASIN  
Planned Location:1967FNL  1773 FELLat/Long: 39.497094 / -108.000050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.497325 / -108.000134Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2010             Measured TD: 7825 ft.    Vertical TD: 7817 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2010
Wellbore PermitDIRECTIONAL
Permit #:20090750 Expiration Date:4/19/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1739 FNL  1946 FEL
Bottom Hole Location:Sec: Twp: Footage: 1739 FNL  1946 FEL
Proposed Depth/Form:7841 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:10/11/2009
Spud Date:10/4/2009Spud Date Is:ACTUAL
Measured TD:7825 ft.Measured PB depth:7769 ft.
True Vertical TD:7817 ft.True Vertical PB depth:7761 ft.
Top PZ Location:Sec:28 Twp: 6S 95WFootage: 1719 FNL  1936 FEL
Bottom Hole Location:Sec:28 Twp: 6S 95WFootage: 1738 FNL  1959 FEL
Log Types:CBL, MUD
Log Types:CBL; PLATFORM EXPRESS, GAMMA RAY, ARRAY INDUCTION/SP
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 33, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2315 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 3215 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7802 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 2870 ft., Bottom: 7802 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2111 ft.
WASATCH G2111 ft.NN
MESAVERDE4319 ft.
CAMEO6999 ft.
ROLLINS7711 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2010                 Interval Top: 5778 ft.    Interval Bottom: 7637 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/30/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/22/2010
Treatment Summary:4010 GALS 7 1/2% HCL; 903100# 30/50 SAND; 27969 BBLS SLICKWATER (SUMMARY). 2 3/8 " TUBING SET AT 7408'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1077
CASING_PRESS 400
MCF_GAS 643
TUBING_PRESS 294
Perforation Data:
Interval Top:5778 ft.# Of Holes:121
Interval Bottom:7637 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)14018
GOR584083
GOR DeterminationMCFE
Average BOE per Day6.690
Average MCFE per Day38.809

 Federal Financial Assurance  i Y

 Tribal Well  i No