Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18197
Well Classification: GW Status: PR - 1/31/2010
Well Name/No:BATTLEMENT MESA #PA 413-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/31/2010
FacilityID:301588LocationID:334825
County:GARFIELD #045Location:NWSE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5104 ft.
Basin:PICEANCE BASIN  
Planned Location:1800FSL  2315 FELLat/Long: 39.464477 / -108.020226Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.464481 / -108.020223Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/31/2010             Measured TD: 7172 ft.    Vertical TD: 6437 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/31/2010
Wellbore PermitDIRECTIONAL
Permit #:20088142 Expiration Date:2/16/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1606 FSL  605 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 1606 FSL  605 FWL
Proposed Depth/Form:7207 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-36 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:9/27/2009
Spud Date:9/22/2009Spud Date Is:ACTUAL
Measured TD:7172 ft.Measured PB depth:7123 ft.
True Vertical TD:6437 ft.True Vertical PB depth:6388 ft.
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 1596 FSL  604 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 1596 FSL  604 FWL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD LOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 39 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 14, Top: 0 ft., Bottom: 39 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1581 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 1581 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7157 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 836, Top: 2350 ft., Bottom: 7157 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1661 ft.NN
MESAVERDE3891 ft.NN
CAMEO6522 ft.NN
ROLLINS7057 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/31/2010                 Interval Top: 5134 ft.    Interval Bottom: 6991 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/17/2009Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2010
Treatment Summary:3514 GA;S 7 1/2% HCL; 823200 #20/40 SAND; 22069 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1063
CALC_GOR 0
CASING_PRESS 1670
MCF_GAS 940
TUBING_PRESS 1542
Perforation Data:
Interval Top:5134 ft.# Of Holes:116
Interval Bottom:6991 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)43
Total Gas Produced (MCF)33364
GOR775906
GOR DeterminationMCFE
Average BOE per Day15.890
Average MCFE per Day92.162

 Federal Financial Assurance  i 

 Tribal Well  i No