Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18101
Well Classification: GW Status: PR - 4/13/2014
Well Name/No:PA #424-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/13/2014
FacilityID:301304LocationID:335035
County:GARFIELD #045Location:LOT 10 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5152 ft.
Basin:PICEANCE BASIN  
Planned Location:716FSL  783 FWLLat/Long: 39.461734 / -108.046482Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461733 / -108.046482Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/24/2014
End Date: 3/30/2014
Reported: 5/23/2014
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/13/2014             Measured TD: 6825 ft.    Vertical TD: 6518 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/13/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:6 Twp: 7S 95W Footage: 165 FSL  2075 FWL
Bottom Hole Location:Sec:6 Twp: 7S 95W Footage: 165 FSL  2075 FWL
Proposed Depth/Form:6745 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-37 , Unit Acreage: 320, Drill Unit: S 1/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1718 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 443, Top: 0 ft., Bottom: 1718 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6796 ft., Weight: 11 , Citings Type: PLANNED
Cement:Sacks: 813, Top: 3424 ft., Bottom: 6796 ft.

Wellbore Completed
Completion Date:2/28/2014
Spud Date:2/22/2014Spud Date Is:ACTUAL
Measured TD:6825 ft.Measured PB depth:6777 ft.
True Vertical TD:6518 ft.True Vertical PB depth:6470 ft.
Top PZ Location:Sec:6 Twp: 7S 95WFootage: 180 FSL  2084 FWL
Bottom Hole Location:Sec:6 Twp: 7S 95WFootage: 187 FSL  2090 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1733 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1733 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6811 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1045, Top: 2364 ft., Bottom: 6811 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1459 ft.
MESAVERDE3582 ft.
CAMEO6177 ft.
ROLLINS6651 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/13/2014                 Interval Top: 4729 ft.    Interval Bottom: 6612 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/24/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/24/2014Treatment End Date:3/30/2014
Treatment Summary:1107306# 40/70 Sand; 30320 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):30320Max pressure during treatment (psi):3364
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):30320Total flowback volume recovered (bbls):6333
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1107306Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6415 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/13/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1072
CALC_MCF_GAS 1595
CASING_PRESS 1841
MCF_GAS 1595
TUBING_PRESS 1522
Perforation Data:
Interval Top:4729 ft.# Of Holes:152
Interval Bottom:6612 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)57
Total Gas Produced (MCF)33945
GOR595526
GOR DeterminationMCFE
Average BOE per Day16.195
Average MCFE per Day93.910

 Federal Financial Assurance  i 

 Tribal Well  i No