Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18090
Well Classification: GW Status: PR - 9/1/2018
Well Name/No:596-29C #12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2018
FacilityID:301129LocationID:335943
County:GARFIELD #045Location:NESW 29 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8183 ft.
Basin:PICEANCE BASIN  
Planned Location:1761FSL  1388 FWLLat/Long: 39.583710 / -108.197270Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.583710 / -108.197270Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/21/2018
End Date: 8/30/2018
Reported: 7/23/2019
Days to report: 327
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2018             Measured TD: 9865 ft.    Vertical TD: 9812 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20087812 Expiration Date:1/27/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2124 FSL  660 FWL
Bottom Hole Location:Sec:29 Twp: 5S 96W Footage: 2124 FSL  660 FWL
Proposed Depth/Form:10126 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:10/25/2009
Spud Date:9/19/2009Spud Date Is:ACTUAL
Measured TD:9865 ft.Measured PB depth:9865 ft.
True Vertical TD:9812 ft.True Vertical PB depth:9812 ft.
Top PZ Location:Sec:29 Twp: 5S 96WFootage: 2160 FSL  691 FWL
Bottom Hole Location:Sec:29 Twp: 5S 96WFootage: 2126 FSL  612 FWL
Log Types:NO LOGS RUN YET AND NO FORMATION TOPS YET.
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 101 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2205 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1221, Top: 0 ft., Bottom: 2204 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9826 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 904, Top: 3000 ft., Bottom: 9825 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 4.5 in., Size: 3.5 in., Top: 0 ft., Depth: 9605 ft., Weight: 9.2# , Citings Type: ACTUAL
Cement:Sacks: 105, Top: 2130 ft., Bottom: 9605 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.
WASATCH2575 ft.
WASATCH G4669 ft.
FORT UNION4998 ft.
OHIO CREEK6527 ft.
WILLIAMS FORK6773 ft.
CAMEO9057 ft.
ROLLINS9645 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/5/2018                  Interval Top: 7839 ft.    Interval Bottom: 9525 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/4/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/21/2018Treatment End Date:8/30/2018
Treatment Summary:12-stage plug-and-perf completion; 96026 total bbls fluid pumped: 95883 bbls recycled water (slickwater) and 143 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):96026Max pressure during treatment (psi):7940
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):143Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):95883Total flowback volume recovered (bbls):33302
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.0625 in.Tubing Setting Depth:9296 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2820
BTU_GAS 1080
CALC_BBLS_H2O 2820
CALC_MCF_GAS 1421
CASING_PRESS 790
MCF_GAS 1421
Perforation Data:
Interval Top:7839 ft.# Of Holes:180
Interval Bottom:9525 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)108
Total Gas Produced (MCF)53405
GOR494490
GOR DeterminationMCFE
Average BOE per Day25.517
Average MCFE per Day148.026

 Federal Financial Assurance  i 

 Tribal Well  i No