Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18074
Well Classification: GW Status: PA - 8/19/2010
Well Name/No:FEDERAL #RWF 514-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PAStatus Date8/19/2010
FacilityID:301015LocationID:335434
County:GARFIELD #045Location:NWSW 19 6S94W 6
Field:RULISON - #75400Elevation:5733 ft.
Basin:PICEANCE BASIN  
Planned Location:1411FSL  439 FWLLat/Long: 39.507041 / -107.936681Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.507036 / -107.936683Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/19/2010             Measured TD: 8565 ft.    Vertical TD: 8424 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/19/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 359 FSL  232 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 359 FSL  232 FWL
Proposed Depth/Form:8461 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:1/14/2010
Spud Date:1/3/2010Spud Date Is:ACTUAL
Measured TD:8565 ft.Measured PB depth:8565 ft.
True Vertical TD:8424 ft.True Vertical PB depth:8424 ft.
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 243 FSL  319 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 243 FSL  319 FWL
Log Types:CBL, RESERVOR MONITOR TOOL ELITE
Log Types:(CH):RPM AND CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1124 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: , Bottom: 1124 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 8545 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1225, Top: 4898 ft., Bottom: 8545 ft., Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4166 ft., Bottom: 4324 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G2460 ft.NN
MESAVERDE4969 ft.NN
CAMEO7455 ft.NN
ROLLINS8409 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  AB - 8/19/2010                 Interval Top: 7510 ft.    Interval Bottom: 8313 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/10/2010
Treatment Summary:1555 GALS 7 1/2% HCL; 201153#20/40 SAND; 7263 BBLS SLICKWATER (SUMMARY)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7510 ft.# Of Holes:59
Interval Bottom:8313 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/19/2010
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No