|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/4/2016 Measured TD: 7415 ft. Vertical TD: 7321 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/4/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/10/2013 | | Proposed Top PZ Location: | Sec:9 Twp: 6s 91w | Footage: 208 FSL 611 FWL | | Bottom Hole Location: | Sec:9 Twp: 6s 91w | Footage: 240 FSL 620 FWL | | Proposed Depth/Form: | 7394 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 513-4 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 513-4 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 513-4 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 70 ft., Weight: 65# , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 70 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1316 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 344, Top: 0 ft., Bottom: 1316 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7394 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 724, Top: , Bottom: 7394 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/4/2012 | | Spud Date: | 8/27/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7415 ft. | Measured PB depth: | 7364 ft. | | True Vertical TD: | 7321 ft. | True Vertical PB depth: | 7271 ft. | | Top PZ Location: | Sec:9 Twp: 6s 91w | Footage: 208 FSL 611 FWL | | Bottom Hole Location: | Sec:9 Twp: 6s 91w | Footage: 240 FSL 620 FWL | | Log Types: | Gamma Ray, High Definition Induction Log, Compensated Z-Densilog, Compensated Neutron Log, Mud, and CBL, RPM | | Log Types: | Gamma Ray, High Definition Induction Log, Compensated Z-Densilog, Compensated Neutron Log, Mud, RMP and CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 68 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 26, Top: 0 ft., Bottom: 68 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1303 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 1303 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7398 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1150, Top: 2730 ft., Bottom: 7398 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 3445 ft. | | | | | CAMEO | 6882 ft. | | | | | ROLLINS | 7142 ft. | | | |
Formation CMEO Formation Classification: GW Status: AB - 11/14/2015 Interval Top: 6878 ft. Interval Bottom: 7122 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | Perforation Data: | | Interval Top: | 6878 ft. | # Of Holes: | 45 | | Interval Bottom: | 7122 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: CM - 2/28/2013 Interval Top: 5151 ft. Interval Bottom: 7122 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 1/21/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/16/2013 | Treatment End Date: | 1/22/2013 | | Treatment Summary: | 4500 Gals 7 1/2% HCL; 1366200#30/50 23100# 100 mesh Sand; 38552 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| | Total fluid used in treatment (bbls): | 38659 | Max pressure during treatment (psi): | 4854 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.54 | | Recycled water used in treatment (bbls): | 38552 | Total flowback volume recovered (bbls): | 14529 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1389300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6520 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1189 | | CALC_MCF_GAS | 383 | | CASING_PRESS | 643 | | MCF_GAS | 383 | | TUBING_PRESS | 277 |
| | Perforation Data: | | Interval Top: | 5151 ft. | # Of Holes: | 206 | | Interval Bottom: | 7122 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: GW Status: PR - 3/4/2016 Interval Top: 5151 ft. Interval Bottom: 6795 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/14/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/4/2016 | Treatment End Date: | N/A | | Treatment Summary: | *** This Form 5A is reporting a CIBP set at 6850'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 5151 ft. | # Of Holes: | 161 | | Interval Bottom: | 6795 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 46 |
| Total Gas Produced (MCF) | 5003 |
| GOR | 108760 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.490 |
| Average MCFE per Day | 14.430 |
| Federal Financial Assurance | i | |
|
|