Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18053
Well Classification: GW Status: PR - 7/31/2010
Well Name/No:FEDERAL #PA 443-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date7/31/2010
FacilityID:300854LocationID:335256
County:GARFIELD #045Location:NESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5839 ft.
Basin:PICEANCE BASIN  
Planned Location:2357FSL  2178 FWLLat/Long: 39.508983 / -108.005364Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.508982 / -108.005365Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2010             Measured TD: 9244 ft.    Vertical TD: 8521 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1885 FSL  263 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 1885 FSL  263 FEL
Proposed Depth/Form:9177 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/22/2010
Spud Date:1/11/2010Spud Date Is:ACTUAL
Measured TD:9244 ft.Measured PB depth:9176 ft.
True Vertical TD:8521 ft.True Vertical PB depth:8453 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 1902 FSL  261 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 1884 FSL  252 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE,MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 41 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 41 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1048 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1048 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9220 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 945, Top: 1050 ft., Bottom: 9220 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2600 ft.
MESAVERDE5539 ft.
CAMEO8372 ft.
ROLLINS9108 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2010                 Interval Top: 6776 ft.    Interval Bottom: 9011 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/8/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/7/2010
Treatment Summary:4000 GALS 7 1/2% HCL; 1266500# 30/50 SAND; 36158 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:8663 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1074
CALC_MCF_GAS 1511
CASING_PRESS 2475
MCF_GAS 1511
TUBING_PRESS 2286
Perforation Data:
Interval Top:6776 ft.# Of Holes:166
Interval Bottom:9011 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)76
Total Gas Produced (MCF)34333
GOR451750
GOR DeterminationMCFE
Average BOE per Day16.429
Average MCFE per Day95.280

 Federal Financial Assurance  i Y

 Tribal Well  i No