Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18052
Well Classification: GW Status: PR - 1/1/2012
Well Name/No:FEDERAL #PA 543-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date1/1/2012
FacilityID:300853LocationID:335256
County:GARFIELD #045Location:NESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5839 ft.
Basin:PICEANCE BASIN  
Planned Location:2359FSL  2191 FWLLat/Long: 39.508967 / -108.005347Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.508967 / -108.005346Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2012             Measured TD: 9260 ft.    Vertical TD: 8516 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/22/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1580 FSL  259 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 1580 FSL  259 FEL
Proposed Depth/Form:9233 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit: UNSPACED

Wellbore Completed
Completion Date:1/11/2010
Spud Date:1/1/2010Spud Date Is:ACTUAL
Measured TD:9260 ft.Measured PB depth:9208 ft.
True Vertical TD:8516 ft.True Vertical PB depth:8464 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 1589 FSL  258 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 1564 FSL  262 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1206 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 1206 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9244 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 4450 ft., Bottom: 9244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3003 ft.
MESAVERDE5523 ft.
CAMEO8389 ft.
ROLLINS9154 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2012                  Interval Top: 6930 ft.    Interval Bottom: 9035 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/18/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/17/2010
Treatment Summary:4635 GALS 7 1/2% HCL; 1101700# 30/50 SAND; 31308 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8719 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1065
CALC_MCF_GAS 1080
CASING_PRESS 2528
MCF_GAS 1085
TUBING_PRESS 2266
Perforation Data:
Interval Top:6930 ft.# Of Holes:138
Interval Bottom:9035 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)67
Total Gas Produced (MCF)30323
GOR452582
GOR DeterminationMCFE
Average BOE per Day14.534
Average MCFE per Day84.286

 Federal Financial Assurance  i Y

 Tribal Well  i No