Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18050
Well Classification: GW Status: PR - 2/16/2011
Well Name/No:FEDERAL #PA 34-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date2/16/2011
FacilityID:300851LocationID:335256
County:GARFIELD #045Location:NESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5839 ft.
Basin:PICEANCE BASIN  
Planned Location:2352FSL  2183 FWLLat/Long: 39.508947 / -108.005372Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.508949 / -108.005371Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/16/2011             Measured TD: 8710 ft.    Vertical TD: 8401 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/16/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1277 FSL  1569 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 1277 FSL  1569 FEL
Proposed Depth/Form:8689 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/1/2010
Spud Date:12/21/2009Spud Date Is:ACTUAL
Measured TD:8710 ft.Measured PB depth:8658 ft.
True Vertical TD:8401 ft.True Vertical PB depth:8349 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 1286 FSL  1585 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 1272 FSL  1562 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Log Types:CEEMENT BOND LOG, MUD LOG, RESERVOIR MOINITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 82 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 31, Top: 0 ft., Bottom: 82 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 890 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 890 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8695 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 4100 ft., Bottom: 8695 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2720 ft.
MESAVERDE5098 ft.
CAMEO7810 ft.
ROLLINS8628 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/31/2011                 Interval Top: 6365 ft.    Interval Bottom: 8526 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/18/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/17/2010
Treatment Summary:4511 GALS 7 1/2% HCL, 1238800# 30/50 SAND, 34406 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CASING_PRESS 1978
MCF_GAS 968
TUBING_PRESS 1827
Perforation Data:
Interval Top:6365 ft.# Of Holes:152
Interval Bottom:8526 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)27230
GOR446393
GOR DeterminationMCFE
Average BOE per Day13.032
Average MCFE per Day75.581

 Federal Financial Assurance  i Y

 Tribal Well  i No