Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18047
Well Classification: GW Status: PR - 2/16/2011
Well Name/No:FEDERAL #PA 433-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date2/16/2011
FacilityID:300848LocationID:335256
County:GARFIELD #045Location:NESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5839 ft.
Basin:PICEANCE BASIN  
Planned Location:2375FSL  2175 FWLLat/Long: 39.509011 / -108.005403Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.509011 / -108.005402Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/16/2011             Measured TD: 8706 ft.    Vertical TD: 8524 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/16/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1943 FSL  1728 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 1943 FSL  1728 FEL
Proposed Depth/Form:8606 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/2/2010
Spud Date:2/23/2010Spud Date Is:ACTUAL
Measured TD:8706 ft.Measured PB depth:8648 ft.
True Vertical TD:8524 ft.True Vertical PB depth:8466 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 1938 FSL  1718 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 1934 FSL  1724 FEL
Log Types:CBL; RPM, MUD
Log Types:CBL/RESERVOIR MONITOR TOOL ELITE-(NOT PRESENT), MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 61 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 61 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 871 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 871 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8689 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 967, Top: 2700 ft., Bottom: 8689 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2700 ft.
WASATCH G2700 ft.NN
MESAVERDE4963 ft.
CAMEO7775 ft.
ROLLINS8499 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2010                 Interval Top: 6284 ft.    Interval Bottom: 8406 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/24/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/23/2010
Treatment Summary:4663 GALS 7 1/2% HCL; 1188932# 30/50 SAND; 33664 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:8122 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CASING_PRESS 2038
MCF_GAS 1015
TUBING_PRESS 1835
Perforation Data:
Interval Top:6284 ft.# Of Holes:168
Interval Bottom:8406 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)14149
GOR471633
GOR DeterminationMCFE
Average BOE per Day6.769
Average MCFE per Day39.252

 Federal Financial Assurance  i Y

 Tribal Well  i No