Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17852
Well Classification: GW Status: PR - 3/31/2010
Well Name/No:FEDERAL #RWF 331-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27871
Facility Status:PRStatus Date3/31/2010
FacilityID:300171LocationID:335382
County:GARFIELD #045Location:SWSE 19 6S94W 6
Field:RULISON - #75400Elevation:5539 ft.
Basin:PICEANCE BASIN  
Planned Location:574FSL  2195 FELLat/Long: 39.504820 / -107.928878Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.504820 / -107.928879Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/31/2010             Measured TD: 8292 ft.    Vertical TD: 8087 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/31/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/2/2010
Proposed Top PZ Location:Sec: Twp: Footage: 613 FNL  1801 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94W Footage: 613 FNL  1801 FEL
Proposed Depth/Form:8305 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:12/17/2009
Spud Date:12/7/2009Spud Date Is:ACTUAL
Measured TD:8292 ft.Measured PB depth:8160 ft.
True Vertical TD:8087 ft.True Vertical PB depth:7955 ft.
Top PZ Location:Sec:30 Twp: 6S 94WFootage: 410 FNL  1461 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94WFootage: 422 FNL  1461 FEL
Log Types:MUD
Log Types:CBL, RPM, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1139 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1139 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8271 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 3800 ft., Bottom: 8271 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2186 ft.
MESAVERDE4683 ft.
CAMEO7240 ft.
ROLLINS8223 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/31/2010                 Interval Top: 5987 ft.    Interval Bottom: 8032 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/3/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/20/2010
Treatment Summary:3290 GALS 7 1/2% HCL; 784799 # 20/40 SAND; 24058 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7744 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1077
CALC_MCF_GAS 931
CASING_PRESS 1292
MCF_GAS 931
TUBING_PRESS 2000
Perforation Data:
Interval Top:5987 ft.# Of Holes:164
Interval Bottom:8032 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)24734
GOR772937
GOR DeterminationMCFE
Average BOE per Day11.772
Average MCFE per Day68.270

 Federal Financial Assurance  i Y

 Tribal Well  i No