Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17851
Well Classification: GW Status: PR - 3/31/2010
Well Name/No:FEDERAL #RWF 31-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27871
Facility Status:PRStatus Date3/31/2010
FacilityID:300172LocationID:335382
County:GARFIELD #045Location:SWSE 19 6S94W 6
Field:RULISON - #75400Elevation:5539 ft.
Basin:PICEANCE BASIN  
Planned Location:544FSL  2143 FELLat/Long: 39.504739 / -107.928692Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.504740 / -107.928693Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/31/2010             Measured TD: 8366 ft.    Vertical TD: 8162 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/31/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/2/2010
Proposed Top PZ Location:Sec: Twp: Footage: 303 FNL  1776 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94W Footage: 303 FNL  1776 FEL
Proposed Depth/Form:8305 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/15/2009
Spud Date:10/4/2009Spud Date Is:ACTUAL
Measured TD:8366 ft.Measured PB depth:8220 ft.
True Vertical TD:8162 ft.True Vertical PB depth:8016 ft.
Top PZ Location:Sec:30 Twp: 6S 94WFootage: 174 FNL  1127 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 183 FNL  1123 FEL
Log Types:CBL, IND/DEN/NEU, MUD
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1123 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8347 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1245, Top: 2950 ft., Bottom: 8347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2185 ft.
MESAVERDE4667 ft.
CAMEO7242 ft.
ROLLINS8210 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/31/2010                 Interval Top: 5981 ft.    Interval Bottom: 8123 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/29/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/20/2010
Treatment Summary:3338 gal 7 1/2% hcl; 903500 # 20/40 sand; 29314 bbls slickwater (summary).
Tubing Size:2.375 in.Tubing Setting Depth:7743 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1087
CALC_MCF_GAS 884
CASING_PRESS 1340
MCF_GAS 884
TUBING_PRESS 2045
Perforation Data:
Interval Top:5981 ft.# Of Holes:159
Interval Bottom:8123 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)28884
GOR760105
GOR DeterminationMCFE
Average BOE per Day13.753
Average MCFE per Day79.779

 Federal Financial Assurance  i Y

 Tribal Well  i No