Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17848
Well Classification: GW Status: PR - 3/31/2010
Well Name/No:FEDERAL #RWF 531-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27871
Facility Status:PRStatus Date3/31/2010
FacilityID:300177LocationID:335382
County:GARFIELD #045Location:SWSE 19 6S94W 6
Field:RULISON - #75400Elevation:5539 ft.
Basin:PICEANCE BASIN  
Planned Location:555FSL  2162 FELLat/Long: 39.504770 / -107.928762Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.504770 / -107.928763Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/31/2010             Measured TD: 8458 ft.    Vertical TD: 8069 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/31/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/2/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1225 FNL  1846 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94W Footage: 1225 FNL  1846 FEL
Proposed Depth/Form:8478 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/16/2009
Spud Date:11/7/2009Spud Date Is:ACTUAL
Measured TD:8458 ft.Measured PB depth:8350 ft.
True Vertical TD:8069 ft.True Vertical PB depth:7961 ft.
Top PZ Location:Sec:30 Twp: 6S 94WFootage: 1216 FNL  1399 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94WFootage: 1234 FNL  1392 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Log Types:CBL, RPM
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2582 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 2582 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8443 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1231, Top: 3700 ft., Bottom: 8443 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2175 ft.
MESAVERDE4854 ft.
CAMEO7372 ft.
ROLLINS8354 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/31/2010                 Interval Top: 6155 ft.    Interval Bottom: 8282 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/29/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/20/2010
Treatment Summary:3782 gals 7 1/2% hcl; 794786 # 20/40 sand; 44474 bbls slickwater (summary).
Tubing Size:2.375 in.Tubing Setting Depth:7839 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1071
CASING_PRESS 1361
MCF_GAS 942
TUBING_PRESS 1272
Perforation Data:
Interval Top:6155 ft.# Of Holes:181
Interval Bottom:8282 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)37
Total Gas Produced (MCF)29459
GOR796189
GOR DeterminationMCFE
Average BOE per Day14.025
Average MCFE per Day81.329

 Federal Financial Assurance  i Y

 Tribal Well  i No