Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17814
Well Classification: GW Status: PR - 2/1/2026
Well Name/No:CHEVRON #TR 313-28-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2026
FacilityID:299990LocationID:335925
County:GARFIELD #045Location:SESW 28 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8377 ft.
Basin:PICEANCE BASIN  
Planned Location:1019FSL  1975 FWLLat/Long: 39.580213 / -108.285317Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.580214 / -108.285316Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2026             Measured TD: 9430 ft.    Vertical TD: 9136 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20086802 Expiration Date:12/3/2009
Proposed Top PZ Location:Sec:28 Twp: 5S 97W Footage: 2014 FSL  625 FWL
Bottom Hole Location:Sec:28 Twp: 5S 97W Footage: 2014 FSL  625 FWL
Proposed Depth/Form:9452 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 510-44 , Unit Acreage: 10, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: 10, Drill Unit:

Wellbore Completed
Completion Date:3/23/2009
Spud Date:1/16/2009Spud Date Is:ACTUAL
Measured TD:9430 ft.Measured PB depth:9382 ft.
True Vertical TD:9136 ft.True Vertical PB depth:9088 ft.
Top PZ Location:Sec:28 Twp: 5S 97WFootage: 2014 FSL  625 FWL
Bottom Hole Location:Sec:28 Twp: 5S 97WFootage: 2014 FSL  625 FWL
Log Types:CBL, HRI, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2652 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2131, Top: 0 ft., Bottom: 2652 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9419 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 724, Top: 4270 ft., Bottom: 9419 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5992 ft.NN
CAMEO8259 ft.NN
ROLLINS8623 ft.NN
COZZETTE8799 ft.NN
CORCORAN9053 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 2/1/2026                  Interval Top: 9073 ft.    Interval Bottom: 9235 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/11/2009Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2009
Treatment Summary:1,504 GAL 10% HCL ACID; 130,000# 100 MESH AND 30/50 SAND; 4,311 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:9073 ft.# Of Holes:29
Interval Bottom:9235 ft.Hole Size:0.36 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 2/1/2026                  Interval Top: 8900 ft.    Interval Bottom: 9049 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/13/2009Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2009
Treatment Summary:1,504 GAL 10% HCL ACID; 143,000# 100 MESH & 30/50 SAND; 4,589 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:8900 ft.# Of Holes:27
Interval Bottom:9049 ft.Hole Size:0.36 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/1/2026                  Interval Top: 6392 ft.    Interval Bottom: 8552 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/13/2009Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2009
Treatment Summary:8,270 GAL 10% HCI ACID; 1,158,800# 100 MESH & 30/50 SAND; 34620 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:6392 ft.# Of Holes:194
Interval Bottom:8552 ft.Hole Size:0.36 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 9/3/2009                  Interval Top: 6392 ft.    Interval Bottom: 9817 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:8/11/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2009
Treatment Summary:11,277 GAL 10% HCI ACID; 1,432,200# 100 MESH & 30/50 SAND; 43,520 BBL SLICKWATER
Tubing Size:3 in.Tubing Setting Depth:9116 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 786
CASING_PRESS 1950
MCF_GAS 786
TUBING_PRESS 1200
Perforation Data:
Interval Top:6392 ft.# Of Holes:250
Interval Bottom:9817 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)91
Total Gas Produced (MCF)31453
GOR345637
GOR DeterminationMCFE
Average BOE per Day15.201
Average MCFE per Day88.176

 Federal Financial Assurance  i 

 Tribal Well  i No