Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17809
Well Classification: GW Status: PR - 9/1/2021
Well Name/No:CHEVRON #TR 324-28-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2021
FacilityID:299985LocationID:335925
County:GARFIELD #045Location:SESW 28 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8377 ft.
Basin:PICEANCE BASIN  
Planned Location:983FSL  1964 FWLLat/Long: 39.580114 / -108.285355Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.580138 / -108.284714Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2021             Measured TD: 9185 ft.    Vertical TD: 9180 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20086800 Expiration Date:12/3/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1146 FSL  1930 FWL
Bottom Hole Location:Sec:28 Twp: 5S 97W Footage: 1146 FSL  1930 FWL
Proposed Depth/Form:9177 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 510-44 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 570-17 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2051 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 2051 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9177 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/8/2009
Spud Date:1/27/2009Spud Date Is:ACTUAL
Measured TD:9185 ft.Measured PB depth:9133 ft.
True Vertical TD:9180 ft.True Vertical PB depth:9128 ft.
Top PZ Location:Sec:28 Twp: 5S 97WFootage: 1147 FSL  1928 FWL
Bottom Hole Location:Sec:28 Twp: 5S 97WFootage: 1147 FSL  1928 FWL
Log Types:CBL, HRI, DEN, NEU
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2566 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2008, Top: 0 ft., Bottom: 2566 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9184 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 589, Top: 4700 ft., Bottom: 9184 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5718 ft.
CAMEO8044 ft.
ROLLINS8410 ft.
COZZETTE8587 ft.
CORCORAN8812 ft.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 9/1/2021                  Interval Top: 8857 ft.    Interval Bottom: 9004 ft.

 Completed Information for Formation CORCORAN
1st Production Date:7/29/2009Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/30/2009
Treatment Summary:1,000 GAL 10% HCI ACID, 140100# 20/40 SAND, 4020 BBLS SLICKWATER
Formation Treatment
Treatment Date:7/29/2009
Treatment Summary:1,000 BBLS 10% HCl ACID, 292,400 # 100 MESH AND 30/50 SAND, 8,296 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:8857 ft.# Of Holes:23
Interval Bottom:9004 ft.Hole Size:0.36 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 9/1/2021                  Interval Top: 8639 ft.    Interval Bottom: 8829 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/5/2009Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/6/2009
Treatment Summary:1,023 GAL 10% HCI ACID, 152644# 20/40 SAND, 4340 BBLS SLICKWATER
Formation Treatment
Treatment Date:8/5/2009
Treatment Summary:1,023 GAL HCl ACID, 152,300 # 100 MESH AND 30/50 SAND, 4,341 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:8639 ft.# Of Holes:21
Interval Bottom:8829 ft.Hole Size:0.36 in.

Formation ILES                     Formation Classification:  GW                     Status:  CM - 7/10/2010                 Interval Top: 8639 ft.    Interval Bottom: 9004 ft.

 Completed Information for Formation ILES
1st Production Date:7/29/2009Choke Size:16.000 in.
Formation Name:ILESCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/29/2009
Treatment Summary:2,000 GAL HCl ACID, 292,400 # 100 MESH AND 30/50 SAND 8,298 BBLS SLICKWATER.
Tubing Size:2.375 in.Tubing Setting Depth:8891 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1040
CASING_PRESS 1500
MCF_GAS 1200
TUBING_PRESS 1000
Perforation Data:
Interval Top:8639 ft.# Of Holes:44
Interval Bottom:9004 ft.Hole Size:0.36 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2021                  Interval Top: 6336 ft.    Interval Bottom: 8359 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/11/2009Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/10/2010
Treatment Summary:9,500 GAL 10% HCI ACID, 1264433# 100 20/40 SAND, 46575 BBLS SLICKWATER
Formation Treatment
Treatment Date:5/9/2010
Treatment Summary:9,500 GAL 10% HCL ACID 1,410,524 # 100 MESH AND 30/50 SAND, 46,575 BBLS SLICKWATER.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:6336 ft.# Of Holes:210
Interval Bottom:8359 ft.Hole Size:0.36 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 7/10/2010                 Interval Top: 6336 ft.    Interval Bottom: 9004 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:7/29/2009Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/30/2009
Treatment Summary:11,523 GAL HCI ACID, 1557177# 20/40 SAND, 54935 BBLS SLICKWATER
Formation Treatment
Treatment Date:7/29/2009
Treatment Summary:11,500 GAL HCl ACID, 1,702,924 # 100 MESH AND 30/50 SAND 54,870 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8891 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/10/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1040
CASING_PRESS 1550
MCF_GAS 750
TUBING_PRESS 1250
Perforation Data:
Interval Top:6336 ft.# Of Holes:254
Interval Bottom:9004 ft.Hole Size:0.36 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 8/27/2012                 Interval Top: 6336 ft.    Interval Bottom: 6336 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/9/2010Choke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:6336 ft.# Of Holes:210
Interval Bottom:6336 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)14371
GOR449093
GOR DeterminationMCFE
Average BOE per Day6.880
Average MCFE per Day39.901

 Federal Financial Assurance  i 

 Tribal Well  i No