Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17783
Well Classification: GW Status: PR - 4/16/2011
Well Name/No:SAVAGE #RWF 343-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC56657
Facility Status:PRStatus Date4/16/2011
FacilityID:299916LocationID:335278
County:GARFIELD #045Location:NWSE 27 6S94W 6
Field:RULISON - #75400Elevation:5258 ft.
Basin:PICEANCE BASIN  
Planned Location:1662FNL  1827 FELLat/Long: 39.493540 / -107.871328Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.493540 / -107.871328Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/16/2011             Measured TD: 7844 ft.    Vertical TD: 7657 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/16/2011
Wellbore PermitDIRECTIONAL
Permit #:20086587 Expiration Date:12/1/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2330 FSL  667 FEL
Bottom Hole Location:Sec:27 Twp: 6S 94W Footage: 2330 FSL  667 FEL
Proposed Depth/Form:7818 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:9/8/2009
Spud Date:9/2/2009Spud Date Is:ACTUAL
Measured TD:7844 ft.Measured PB depth:7788 ft.
True Vertical TD:7657 ft.True Vertical PB depth:7601 ft.
Top PZ Location:Sec:27 Twp: 6S 94WFootage: 2301 FSL  739 FEL
Bottom Hole Location:Sec:27 Twp: 6S 94WFootage: 2325 FSL  685 FEL
Log Types:CBL AND RPM
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 102 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 45 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1130 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7822 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 2480 ft., Bottom: 7822 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1350 ft.
MESAVERDE3986 ft.
CAMEO6762 ft.
ROLLINS7723 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/31/2010                Interval Top: 4929 ft.    Interval Bottom: 7640 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/1/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/29/2010
Treatment Summary:5027 GALS 7 1/2% HCL; 1220900 # 20/40 SAND; 29540 BBLS SLICKWATER (SUMMRY).
Tubing Size:2.375 in.Tubing Setting Depth:7185 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1099
CASING_PRESS 2126
MCF_GAS 1139
TUBING_PRESS 1919
Perforation Data:
Interval Top:4929 ft.# Of Holes:169
Interval Bottom:7640 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)68
Total Gas Produced (MCF)35412
GOR520764
GOR DeterminationMCFE
Average BOE per Day16.917
Average MCFE per Day98.113

 Federal Financial Assurance  i 

 Tribal Well  i No