Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17637
Well Classification: GW Status: PR - 12/5/2012
Well Name/No:FEDERAL #RWF 411-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date12/5/2012
FacilityID:299273LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:212FSL  1595 FWLLat/Long: 39.518215 / -107.932576Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518210 / -107.932573Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/5/2012             Measured TD: 8950 ft.    Vertical TD: 8728 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/5/2012
Wellbore PermitDIRECTIONAL
Permit #:20091258 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 514 FNL  243 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 514 FNL  243 FWL
Proposed Depth/Form:8874 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:N/A
Spud Date:10/24/2009Spud Date Is:ACTUAL
Measured TD:8950 ft.Measured PB depth:8894 ft.
True Vertical TD:8728 ft.True Vertical PB depth:8672 ft.
Top PZ Location:Sec:19 Twp: 6s 94wFootage: 515 FNL  259 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 508 FNL  267 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Log Types:CBL, RPM
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: , Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1151 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1151 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8934 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 984, Top: 5160 ft., Bottom: 8934 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 6506 ft., Depth: , Bottom: 6579 ft., Sacks: 200, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2762 ft.
WASATCH G2762 ft.NN
MESAVERDE5268 ft.
CAMEO7894 ft.
ROLLINS8866 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/5/2012                 Interval Top: 6745 ft.    Interval Bottom: 8692 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/25/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:9/30/2012Treatment End Date:9/24/2012
Treatment Summary:CEMENT SQUEEZE 6506-6677' TO SHUT OFF WATER. THEN PRODUCE REMAINING PERFS (6745-8692') WITH NO NEW STIMULATION TREATMENT.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/18/2009
Treatment Summary:5035 GALS 7 1/2% HCL; 826300 # 20/40 SAND; 24263 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8495 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2012Test Method:FLOW
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1109
CALC_MCF_GAS 230
CASING_PRESS 1565
MCF_GAS 230
TUBING_PRESS 1240
Perforation Data:
Interval Top:6745 ft.# Of Holes:159
Interval Bottom:8692 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)17251
GOR638925
GOR DeterminationMCFE
Average BOE per Day8.226
Average MCFE per Day47.723

 Federal Financial Assurance  i Y

 Tribal Well  i No