Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17637
Well Classification: GW Status: PR - 12/5/2012
Well Name/No:FEDERAL #RWF 411-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date12/5/2012
FacilityID:299273LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:212FSL  1595 FWLLat/Long: 39.518215 / -107.932576Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518210 / -107.932573Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/5/2012             Measured TD: 8950 ft.    Vertical TD: 8728 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/5/2012
Wellbore PermitDIRECTIONAL
Permit #:20091258 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 514 FNL  243 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 514 FNL  243 FWL
Proposed Depth/Form:8874 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:N/A
Spud Date:10/24/2009Spud Date Is:ACTUAL
Measured TD:8950 ft.Measured PB depth:8894 ft.
True Vertical TD:8728 ft.True Vertical PB depth:8672 ft.
Top PZ Location:Sec:19 Twp: 6s 94wFootage: 515 FNL  259 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 508 FNL  267 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Log Types:CBL, RPM
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: , Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1151 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1151 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8934 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 984, Top: 5160 ft., Bottom: 8934 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 6506 ft., Depth: , Bottom: 6579 ft., Sacks: 200, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2762 ft.
WASATCH G2762 ft.NN
MESAVERDE5268 ft.
CAMEO7894 ft.
ROLLINS8866 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/5/2012                 Interval Top: 6745 ft.    Interval Bottom: 8692 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/25/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:9/30/2012Treatment End Date:9/24/2012
Treatment Summary:CEMENT SQUEEZE 6506-6677' TO SHUT OFF WATER. THEN PRODUCE REMAINING PERFS (6745-8692') WITH NO NEW STIMULATION TREATMENT.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/18/2009
Treatment Summary:5035 GALS 7 1/2% HCL; 826300 # 20/40 SAND; 24263 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8495 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2012Test Method:FLOW
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1109
CALC_MCF_GAS 230
CASING_PRESS 1565
MCF_GAS 230
TUBING_PRESS 1240
Perforation Data:
Interval Top:6745 ft.# Of Holes:159
Interval Bottom:8692 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)17535
GOR626250
GOR DeterminationMCFE
Average BOE per Day8.362
Average MCFE per Day48.507

 Federal Financial Assurance  i Y

 Tribal Well  i No