Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17636
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 311-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date6/30/2010
FacilityID:299272LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:210FSL  1588 FWLLat/Long: 39.518209 / -107.932601Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518204 / -107.932600Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8957 ft.    Vertical TD: 8703 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091259 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 847 FNL  253 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 847 FNL  253 FWL
Proposed Depth/Form:8919 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/14/2009
Spud Date:11/4/2009Spud Date Is:ACTUAL
Measured TD:8957 ft.Measured PB depth:8897 ft.
True Vertical TD:8703 ft.True Vertical PB depth:8643 ft.
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 835 FNL  302 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 838 FNL  293 FWL
Log Types:CBL; IND/DEN/NEU, MUD
Log Types:CBL, RPM
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1144 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1144 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8942 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 5500 ft., Bottom: 8942 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND2766 ft.
WASATCH G2766 ft.NN
MESAVERDE5312 ft.
CAMEO7916 ft.
ROLLINS8858 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/31/2010                 Interval Top: 6605 ft.    Interval Bottom: 8772 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/20/2009Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/18/2009
Treatment Summary:5559 GALS 7 1/2% HCL: 955230 # 20/40 SAND: 27601 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8267 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1107
CASING_PRESS 1798
MCF_GAS 907
TUBING_PRESS 1586
Perforation Data:
Interval Top:6605 ft.# Of Holes:156
Interval Bottom:8772 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)43
Total Gas Produced (MCF)29237
GOR679930
GOR DeterminationMCFE
Average BOE per Day13.922
Average MCFE per Day80.755

 Federal Financial Assurance  i Y

 Tribal Well  i No